how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation
Answers were Sorted based on User's Feedback
Answer / adarsh
Cement =(1*1.54/(1+2+4))/0.0347
= 6.34 bag
Sand =2*(1*1.54/(1+2+4))
=0.44 Cum.
Aggregate=4*(1*1.54/(1+2+4))
=0.88 Cum.
Assume
W/C= 0.55
Water = 6.34*0.347*0.55*1000
=120.998 l.
| Is This Answer Correct ? | 59 Yes | 22 No |
Answer / aamir shahzad
ratio is 1:2:4 sum is equle 7
1 bag cement is equle to 1.25
total quantity resum is 200 cft
dry Volume of total quantity which is 200 cft to multiply
1.54 will be the value of total quantity is 308 cft.
which is the total quantity 308 multiply 1(which is cement
ratio)and divided 7 which is the sum of ratio it will
become 44 and now we convert cft to cement bag which is the
value of 1.25 for bag.
44 divided by 1.25 is 35.2 the Sum is 35.2 Cement of Bags.
same for sand. which value was came after dry
308 multiply ratio of sand which is 2 then divided sum of
the ratio which is 7 will become the value of Sand is=88 cft
for crash 308 multiply 4 which is the value of crush and
devided by sum of value which is 7 total sum will become
176 cft.
Total sum of quantity of 1:2:4 mean.
Cement=35.2 Bags
Sand= 88 cft
Crush= 176 cft
These are right answer.
| Is This Answer Correct ? | 48 Yes | 17 No |
Answer / s.rama pandia raj ( asst.manag
i will go with answer of Mr.Adishankar, but i feel a small
suggestion
cement-1
sand-2 with bulking 25% is 2.5
metal- 4
volume of 1m3 of wet concrete is equal 1.54 times of dry
mix
so cement required is 1.54/7=0.22m3 of cement equals 6.34
bags (0.22/0.0347)
sand required is 2.5/7=0.357*1.54=0.55m3 or 0.22*2.5=0.55m3
metal required is 0.22*4=0.88m3
1m3 of 1:2:4 nominal concrete mix contains
cement-6.34 bags
sand - 0.55 m3 with 25% bulking in normal practice
metal - 0.88m3
| Is This Answer Correct ? | 22 Yes | 9 No |
Answer / ajmal
2.83 CU.M = 1 UNIT
1 UNIT = 22 BAG CEMENT
1 UNIT = 70 FEET SAND
1 UNIT = 90 FEET METAL
1 UNIT = 200 KG STEEL(NET ONLY)
| Is This Answer Correct ? | 20 Yes | 7 No |
Answer / mavani hitesh
for mixing of 1:2:4 proportion
1 is stand for cement, 2 stand for sand and 4 stand for aggregate.
for volume batching.standard pharma is used.which is of 35 liter.
for 1 bag proportion.
cement= 1 bag
sand= 2*35
= 70 liter
aggregate= 4*35
= 140 liter
in cum
1 cum = 1000 liter
70+140=210 liter
reduce 25% of 210 for wet mixed.
which comes 158 liter
1000 liter/158 = 6.36 bag of cement
| Is This Answer Correct ? | 19 Yes | 7 No |
Answer / buhari adam nuhu kaakamu
NOTE:
1 CuM of concrete
Avg. final mix (Decnce) (AFM) = 1.52
Total proportion (TP) 1+2+4 = 7
Unit weight of cement =1440 KG/CuM
Solution.
Cement quantity required = AFM/TP
= 1.52/7
= 0.217 CuM
Cement is measure by weight
So therefore you multiply 0.217 by unit weight of cement
Cement quantity = 0.217 * 1440 = 312.48 KG.
Number of Cement bags = 312.48 / 50
= 6.2496 bags
Sand quantity = TP * 2
= 0.217 * 2
= 0.434 CuM
Stone quantity = TP * 4
= 0.217 * 4
= 0.868 CuM
Quantity of materials
Cement Bags = 6.2496 Bags
Sand = 0.434 CuM
Stone = 0.868 CuM
| Is This Answer Correct ? | 11 Yes | 0 No |
Answer / ganesh
M15=1:2:4
1140/2=720*0.45=324/50=6.5/bags
1cement bag=0.0347/cum
Cement=0.0347*6.5=0.225
Sand=0.0347*2=0.451
Aggregate=0.0347*4=0.902
| Is This Answer Correct ? | 40 Yes | 30 No |
Answer / pandian.a
cement = spgr/1+2+4=1.56/7=0.22cum sp gr of 20 mm=1.56c
0.22*1440=317 kg
317/50=6.5 bags wt of cement =1440kg/cum
sand=0.22*2=0.44cum
coarse
aggregate=.22*4=0.88cum
so cement=605 bags
sand=0.44 cum (15.52cft)
corse aggregate=0.88cum (31.04cft)
w/c ratio=12.5litre/bags
| Is This Answer Correct ? | 13 Yes | 7 No |
Answer / narsimulu r sanghi
The ratio is 1:2:4, so total ratio is 1+2+4=7
considering 1cum.
cement = (1 x 15.4)/7= 2.2 cum
= 2.2/.347=6.3bags
sand=2.2x2=4.4cum
metal=2.2x4=8.8cum
| Is This Answer Correct ? | 45 Yes | 41 No |
calculation of quantities of cement and sand in 1cum mortar with 1:6 ratio
What is the best type of wood glue?
how much need sand and cement for 1 cft roof construction?
0 Answers Indus Valley Construction IVCC,
GIVE US DETAIL OF YOUR PRESENT EMPLOYMENT STATUS?
What is special features of RGS Rebar detaling software?
density of flyash
is concealed wiring a problem in fly ash brick wall?
What is mean by Rolling Margin Of Steel????
4 Answers Dilip Buildcon, L&T, NCCL,
In which year onward limit state method used in india...
how to calculate quantity of steel in a slab , coloumn and beam
1 Answers JSW, Om Sai Builders,
why you considers yourself suitable for the post of site engineer
5 Answers Consultancy, Nalco, Ritspin Synthetics,
why +1 to be followed for calculating the no of bars in BBS. Please explain
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)