why you considers yourself suitable for the post of site
engineer
Answers were Sorted based on User's Feedback
Answer / mamatha
Bcoz of my capability to plan the material and labour
requirement weekly and monthly.And also adhering to those
targets thus completing the project in time.
| Is This Answer Correct ? | 19 Yes | 5 No |
Answer / sumeet
as i think that i am capable of doing this kind of work as i
did many work visit and liked to do work in the field. also
im good at management so i wold love to handle the situation.
| Is This Answer Correct ? | 9 Yes | 7 No |
Answer / shahzad
actually so far as i think that i'm capable of doing such kind of work b,coz previously i'hv workd some where and entirely awared with the terminology of site work.thats why i like to work on site and feel suitable for this position
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / nitesh
i think m suitable to work as a site engineer because i m too curious to manage the things around me and the tasks allotted in the most efficient manner.i think that i can suitablt adjust myself in the workng environment of the organisation and too in an effefective manner for the growth company..
| Is This Answer Correct ? | 1 Yes | 1 No |
Answer / satish nirmal
site engineer is a monitor of all team member who will work under him and think i can handle very efficiently, as have a passion also to execute the construction work very properly. i like to play a vital role for doing coordination with consultant and architect.
| Is This Answer Correct ? | 0 Yes | 0 No |
Concrete how muvh strenght gain 7days,14day,s,21day's,28day's&56day's after curing
What is the rate for RMC25 grade concreter in rs/cu mtr? What is the container capacity of RMC transporter in cu mtr?
2 Answers Akanksha, UltraTech,
how we can prevent freshly laid concrete from rain ,, What the plastering thickness for a) inner brickwork b) outer brickwork c) beams & slabs
what is the requierd compressive strenth for m 20 grade concreat for 7 days?
1 building project (work in progress) and following are sum detail about his project 1) Using local rebar grade 415 2) Total built up area- 60000 sq.ft 3) Floors to be constructed – 21 storey 4) Estimated requirement of Steel per sq. foot – 7KG/sq.ft 5) Concrete grade – M35 6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm for stirrups) Wanted to ask u if this person uses 500D…what are the benefits he will be getting? Whether his per Sq. foot consumption can b reduce? If yes den around how much?
how to draw road profile
what energized you to complete your course?
How to arrive dry volume of concrete (1.52 to 1.57) ?
Define What is diversion tunnel in a dam?
what is the procedure involved in preparing mix design of m15 grade as per IS-10262-1982
what is the I.S. CODE of RCC
I want to construct 1850 square ft of rcc apartment , with stilth parking , the site requires 18 ft of pile foundation , the apartment will be above ground parking , can some one guide me about the cost of construction of such structure in Pune ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)