how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation

Answers were Sorted based on User's Feedback



how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / shubham kumar

M15=1:2:4. for cement concrete. 101â„… right answer

calculate

a. cement. 1×1.54/7=0.22cum×28.8(for bag)=6.33 bags

b. sand 2×1.54/7=0.44 cubic metre

c. aggregate. 4×1.54/7=0.88 cum

Is This Answer Correct ?    8 Yes 5 No

how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / shahnawaz

calculation for 1:2:4(M15)
take 50%extra for shrinkage/wastage
1+.5=1.5/1+2+4=.214
now, in 1 bag of cement having qty =.0347cum
so,.214/.0347=6.16 no of bags.
for sand,.214x2=.428 cum
for aggregate,.214x4=.856cum
for cft just x35.31

Is This Answer Correct ?    7 Yes 5 No

how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / laxmikant kirpankar

DENSE VOLUME OF 1 M3 OF 1:2:4 m15 Conc.=1.52m3 approx.
Ratio (1+2+4)=7
=1.52/7= 0.22m3 Cement required for 1m3 of conc
Proportion(1:2:4)
1 Part of Cement=( 1x0.22=0.22 m3 Cement required for 1m3)
2 part of sand =(2x0.22= 0.44m3 Sand required for 1m3)
4 Part of aggregate=( 4x0.22=0.88m3 Aggregate for 1m3)

Note: Volume of 1 Bag of Cement = 0.035m3
Hence 0.22m3/ 0.035= 6.28 Bags of cement required for 1m3 of concrete

Is This Answer Correct ?    2 Yes 0 No

how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / venkatesh babu rj

Cement - 1 Part
Sand - 2 part
Aggregate - 4part

Cement = 1440 x 0.9/4
= 324Kg/m3 or 6.48Bags(324/50).
Sand = 1440 x 0.45/2
= 324kg/m3.
Aggregate = (1.25x4x6.48)/35.315
= 0.917Cu.m

Is This Answer Correct ?    4 Yes 3 No

how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / engr. hammad khan

I'm a professional civil engineer, here is a perfect simple method.
Let suppose you have total 100 cft of concret.
1.How to calculate number of cement bags.
=100*1.54/(7*1.25)
2. Amount of sand in cft
=no.s of bags*1.25*2
3. Amount of crush in cft
= amount of sand*2

Is This Answer Correct ?    1 Yes 0 No

how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / khurram

ratio is 1:2:4 sum is equle 7
1 bag cement is equle to 1.25
total quantity resum is 200 cft
for cement bags ;200 divide bt ratio which is 7 answer is 28.57
than
28.58 multiply by 1 wich is first figure of ratio
than divided by 1.25 which is volume of 1 cement bag
the answer is calkled cement bags
example
cement bags ;200/7=28.57*1/1.25=22.85 bags
for sand 200/7=28.57*2=57.14 cft
for crash 200/7=28.57*4=114.25 cft

Is This Answer Correct ?    38 Yes 38 No

how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / vinod

45*15 feet construction so require cement

Is This Answer Correct ?    0 Yes 0 No

how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / msr

VERY NICE

Is This Answer Correct ?    0 Yes 0 No

how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / satish kumar lade

Constant of Dry volume /m3 = 1.5
1:2:4 = 1+2+4=7
1.5/7=0.214
1 cum = 1440 kg cement
1440 x 0214 = 308.57 kg

Is This Answer Correct ?    0 Yes 0 No

how to calculate 1:2:4 ratio concrete cement, sand, metal and water please give me brief calculati..

Answer / farhan tanoli

In order to estimate the quantity of loose materials to have
100 cubic feet wet concrete we first multiply the wet
concrete by 1.54.
e.g 100x1.54=154 cubic feet of dry materials we need.

now come to the ratio of concrete which is 1:2:4 so sum of
the ratio will be 1+2+4=7

calculating separately each material:

Cement: 1/7x154 = 22 cubic feet
where 1 bag of cement measured 1.25 cubic feet approx
therefore 22/1.25 = 17.6 bags of cement. 1 bag contains 50kg
cement so total cement by weight we need for 100 cubic feet
concrete = 17.6x50 = 880kgs

sand: 2/7x154 = 44 cubic feet

coarse aggregate: 4/7x154 = 88 cubic feet

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

What expenses counted in contingencies and how much it is in related to built-up area of the building.

0 Answers  


what is water cement ratio and how to calculate it after designing the concrete?

6 Answers   Schlumberger, TATA,


What is the quantit;(pratical method) of cement, sand, and gravel to be used in M25 grade of concrete for 1000 x 1000 x 1000 mm of sand (for cement please mention in kilos, and for sand and gravel please mention in cuft

1 Answers  


what is silica fumes or micro silica? and whr is it used? wat r its advantages?

10 Answers  


how can change 10mm dia @275 c/c bar spacing to 12 mm

4 Answers   MEIL,






where the corner reinforcement be placed in the rigid road pavement? can it be placed below the bottom main bar of double netting pavement?

1 Answers  


Whats maxi. slump of M-7.5 Concreit for PCC

2 Answers   Indiabulls, Swastik Group,


How do you calculate load bearing capacity of a waffle slab?

0 Answers  


koi bta sakta ha ka steel ko calculate krna ka full mathod pls

4 Answers  


find the discharge of water through a horizental venturimeter having 400mm dia at the inlet main and 150mm dia at thorat.if the diffrential gauge between inlet and thorat shows a pressure head of 25cm mercury. assume coefficient discharge 0.98 and specfic gravity of mercury as 13.6.

0 Answers   UPSC,


what is pmc(in rigid pavement)

1 Answers  


human blood is newtonian or non- newtonian fluids

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)