how to calculate 1:2:4 ratio concrete cement, sand, metal
and water please give me brief calculation
Answer Posted / aamir shahzad
ratio is 1:2:4 sum is equle 7
1 bag cement is equle to 1.25
total quantity resum is 200 cft
dry Volume of total quantity which is 200 cft to multiply
1.54 will be the value of total quantity is 308 cft.
which is the total quantity 308 multiply 1(which is cement
ratio)and divided 7 which is the sum of ratio it will
become 44 and now we convert cft to cement bag which is the
value of 1.25 for bag.
44 divided by 1.25 is 35.2 the Sum is 35.2 Cement of Bags.
same for sand. which value was came after dry
308 multiply ratio of sand which is 2 then divided sum of
the ratio which is 7 will become the value of Sand is=88 cft
for crash 308 multiply 4 which is the value of crush and
devided by sum of value which is 7 total sum will become
176 cft.
Total sum of quantity of 1:2:4 mean.
Cement=35.2 Bags
Sand= 88 cft
Crush= 176 cft
These are right answer.
| Is This Answer Correct ? | 48 Yes | 17 No |
Post New Answer View All Answers
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
Explain the different types of building contracts?
Can we use concrete of slump cone in cube casting in which we have already measured slump?
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
What is the cemnent ratio
what is the weight of 12mm aggregates?
what is cross hair cursor?
During reclamation how can the occurrence of mud waves can be rectified?
What is meant by cartesian coordinate system?
whaat is blister in box girder bridge and what is its function..
What are the strongest shapes in building?
What are the techniques to measure road difference?
what is project?
Time required for curing of wall tiles before fixing