Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


calculation of quantities of cement and sand in 1cum mortar
with 1:6 ratio

Answers were Sorted based on User's Feedback



calculation of quantities of cement and sand in 1cum mortar with 1:6 ratio..

Answer / balachandra mahendra

cement=6.514bags
sand=1.3028cum

Is This Answer Correct ?    3 Yes 0 No

calculation of quantities of cement and sand in 1cum mortar with 1:6 ratio..

Answer / balachandra mahendra

cement=6.514
sand=1.3028

Is This Answer Correct ?    2 Yes 0 No

calculation of quantities of cement and sand in 1cum mortar with 1:6 ratio..

Answer / gauri muthe

cement-250 kg
sand-1.05 cum

Is This Answer Correct ?    1 Yes 0 No

calculation of quantities of cement and sand in 1cum mortar with 1:6 ratio..

Answer / soumen jana

cement ;- 4 begs & 5.75 kg
sand ;- 30.25 cft

Is This Answer Correct ?    0 Yes 0 No

calculation of quantities of cement and sand in 1cum mortar with 1:6 ratio..

Answer / muslim khan

i can convert the Motor into dry *by 1.27 (1.27cum) then after
divide by Moter with some of ratio 7(1.27/7=0.181cum Cement)1bag
of cement =to 0.0354cum(0.181/0.0354=5.12bags of cement)and sand
is = to 1.08cum.

Is This Answer Correct ?    0 Yes 0 No

calculation of quantities of cement and sand in 1cum mortar with 1:6 ratio..

Answer / syed azhar

Sand = 0.20 cum.
Cement = 0.20 xdensity of cement/last digit of ratio)
0.20x1440/6=48 kgs.
No of bags = 48/50 kg in a bag= 0.96 bag. Say one bag.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

In few lines, please be elaborative on extras and talents that make you a potential candidate for the post:

0 Answers  


Are you a team player?

0 Answers  


Sand density

3 Answers  


What is a hatch patterns?

0 Answers  


What is green building?

13 Answers  


Whr should a joint be located in a beam if the provision of a joint is unavoidable??

2 Answers   BMTC,


Which Cement is good for concrete, Is that grade 33, 43 or 53?

10 Answers   Modi Builders,


what is the minimum and maximum thickness of plaster.?

11 Answers   Arabtec,


For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.

0 Answers  


what is the shuttering normal clear cover for footings, walls, beams & columnms

7 Answers  


time and work questions

0 Answers  


At which place Construction joint should provide in slab and Beam at the time of casting.

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)