Do you use group BOMs for engineering/design and copy or
assign them to plants at implementation?

Answer Posted / sinds

during design phase designer maintain group bom then assign
to one or all plants.

and if bom created eith out ref to plant, bom valid through
all plants

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?

603


Explain about rough cut planning

1365


Explain the uses of the simple maintenance interface?

631


Explain In-process inspection.

1015


What is the need of mrp list if the stock requirement list is already given?

598






What is 'mps' (master production scheduling)?

702


In the monthly lot size proc, how to generate lot at the end of Period?

3710


How requirements( pir,sles order, customer requirement) are reduced after they are produced?

617


What is Phantom Assembly?

1077


When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP

3337


how many times pcc can run for one material?

2165


What is the role of an administrator in pa?

616


What is plm (product lifecycle management) in sap pp?

593


Explain what happens to planned after it has been converted into production order?

554


Can we create production order without bom and routing ?

664