Which are the master data relevant for PP module?
Answers were Sorted based on User's Feedback
Answer / b.arun
M<aster data in SAP PP Consists of the following:
1.Material Master
2.BOM(Bill of Material)
3.Workcenter
4.Routing
5.PRT(Production Resource Tool)
Is This Answer Correct ? | 53 Yes | 4 No |
Answer / amit
Master data in SAP PP Consists of the following:
1.Material Master
2.BOM(Bill of Material)
3.Workcenter
4.Routing
5.PRT(Production Resource Tool
Is This Answer Correct ? | 15 Yes | 2 No |
Answer / s
1. Material Master
2. BOM
3. Routing
4. Production Version
5. Workcenter
Is This Answer Correct ? | 15 Yes | 6 No |
Answer / abdulrahman
SAP PP masterc data consists of the following givens :
1- material Master
2- BOM (Bill of material)
3- Routing
4- WOrk center
5- PRT (Production Resource Tools)
Best Regards
Abdulrahman Abdulaziz
Is This Answer Correct ? | 3 Yes | 2 No |
Answer / govind mandhare
SAP PP Master data consists of below given configuration.
1 Material Master
2 Bill of Material
3 Routing
4 Workcenter
5 MMSC
Is This Answer Correct ? | 2 Yes | 2 No |
Checkdigit example
i have one particular part 'A'. it is available in two storage location X & Y. when i run MRP, I don't want MRP to consider stock that are available in storage location Y. what should be done
suppose we have sales order-40, PIR-25,warehouse stock-40, so when we run mrp,what quantity the system displays with MTO & MTS. How?
We have deleted a group key in an operation in routing and the same does not appear for this routing (CA02). But we noticed that entries are maintained in table PLPO and the deletion indicator is not set. How does the system remember this deletion of group key?
What is meant by payscale structure? How did you configure the payscale structure?
When you run MRP, What steps it Perform in Back ground or How do you schedule BG job for MRP
what is the meaning of explodinG a BOM
We defined sop in months. However, during sop transfer to demand management, our independent requirements are appearing in weeks. How can we correct this from weeks into months?
What is the planning horizon?
Can any body explain me why work scheduling view is required for semi finished and finished products?
How can I use variable size items?
Consignment matl how will be use