Master data in SAP PP Consists of the following:
1.Material Master
2.BOM(Bill of Material)
3.Workcenter
4.Routing
5.PRT(Production Resource Tool
Is This Answer Correct ? | 15 Yes | 2 No |
Post New Answer View All Answers
any one can provide me some sample resume for SAP PP with 0 to 1 year experience?
What are the questions we need while we go company for analysis to implementation SAP? What we need to know generally? How can we define we need abab for improvement?
Standard mrp steps
what are the settings needed for variant configuration?
Explain what is the need of mrp list if the stock requirement list is already given?
What is sla (service level agreements)?
What are the MRP master data?
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
What are sequence, parallel, overlapping, splitting and where can we assign these
Can't one material be assigned to more than one operation in a routing, why?
Difference between Item categories or what is variable size item or non stock item.
Explain PI sheet.
Different types of consumption based planning.
Both labor and machine categories exist. How would you calculate the process time?
Explain LTP.