Which are the master data relevant for PP module?
Answer Posted / abdulrahman
SAP PP masterc data consists of the following givens :
1- material Master
2- BOM (Bill of material)
3- Routing
4- WOrk center
5- PRT (Production Resource Tools)
Best Regards
Abdulrahman Abdulaziz
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
Define gaps.
How system calculate the actual cost?
What are the key fields in MRP views?
What is Backflush, the places where the backflush is used?
Explain 'mrp' (material requirements planning)?
Explain DMR.
We want the system to run a single level mrp automatically on receipt of the sales order. How to configure triggering event based mrp?
Explain schedule margin key
We want to report on several status combinations like each order that has status ‘not deleted’ and ‘not technically completed’. What set up is required?
How is indian slab and us slab?
Mention what is the use of t-code cs20 in bom?
How can I use variable size items?
What is purpose of schedule margin key?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
What is serial number and where you will be configure