Can anybody tell which type of quections are asked in
interview for projects?
plz give its urgent.....!
Answers were Sorted based on User's Feedback
Answer / rajat jain
On projects following imp questions r asked:-
Most imp ques.-What is the application of your project?
Why this project?(Answer to this question must be pin
pointed as if u had chosen an offstream project.)
IS it cost effective?How much is the cost?
Is it practical i.e. can be implemented?
What is the working principle?
Draw and explain the block diagram?
description of power supply.
description of components if asked at circuit level.
Rating of each and every component
Cost of every component.
There a lot of questions on powersupply and coponent
structure.
For more ques contact me.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / vaibhav vt
In projects questions can be asked mainly on erection and
commissioing.
Also they can judge your overall project managment skills.
They can ask for any small example of anyproject you did.
they can mainly ask your role first in any project.
My advice--Do not lie and tell the truth only.Tell those
things which you are really good at.
| Is This Answer Correct ? | 3 Yes | 0 No |
how to draw a flowchart for swapping two numbers using bit wise operators?
how to do dynolab wind speed sensor loop test, how to simulate value,i have simulate mA 4-20mA but not responding in DCS faceplate, please kindly advice me any one.
How to measure Flow of air line,what is the procedure of creating DP in line to measure Flow!
If Solenoidal valve works in manual mode but not in Auto mode. What should be the problem?
8 Answers Bharathi Cement, Titanium,
A temperature sensor (RTD) connected via a temperature transmitter is adjusted to give an output of 4ma at 60 deg and 20 ma at 600 deg. This output (4-20ma) from the transmitter is connected to an IGBT-inverter to control a high speed (-12,000 to +12,000 RPM) DC motor. And in the inverter it is programmed as, for 4ma the motor speed will be -3,000 RPM and for 20ma the motor speed will be +10,000 RPM. The question is : If the motor speed is +5,500 (RPM), what will be the temperature? (-sign indicates that the motion is in reverse direction).
what is burner management system?
Describe a time when you anticipated potential problems and developed preventive measures.
what do u mean by compensation n pid tunning?in pid tunning what you tunned?is it possible 2 tune p i d
define SIMULATION a and what is the need of it
Can anyone convert a 5/2 way or 3/2 way valve into an ISO valve?
How can i solve the problem of ROSEMOUNT 5300 guided wave level transmitter of full range? For more clearfication , another guided wave level transmitter VEGA brand have the same problem and i solved it by drain the champer from water and make "false signal suppretion" from transmitter push buttons it's configuration to tell the transmitter to avoid any built-up signal ,,, so my question how can i avoid the problem that rosemount read full range while the champer empty or any other ????
why Fahrenheit unit of moistur analyzer transmitter
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)