Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Can anybody tell which type of quections are asked in
interview for projects?
plz give its urgent.....!

Answer Posted / rajat jain

On projects following imp questions r asked:-
Most imp ques.-What is the application of your project?
Why this project?(Answer to this question must be pin
pointed as if u had chosen an offstream project.)
IS it cost effective?How much is the cost?
Is it practical i.e. can be implemented?
What is the working principle?
Draw and explain the block diagram?
description of power supply.
description of components if asked at circuit level.
Rating of each and every component
Cost of every component.
There a lot of questions on powersupply and coponent
structure.
For more ques contact me.

Is This Answer Correct ?    3 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

In turbine, what does term CDP, NI, NH, HSSOC, means

2747


sir, give me placement papers and interview quistion of birla group company of copper.

2837


Where Can i take a SPI INtools training in Mumbai? In Rolta India Ltd to whom I should approach regarding of SPI INtools Training?

2761


how to commission furnace ( water heater)

2028


what is a good line as ic engineer as maintenance ,oc, project, calibration ,validation engineer?

1951


the pump holds on run indication into the dcs and filed local control panel remote push button condition operaton wrong like when the push button pushing conditions the pump is off and the push button release condition the pump is on totally opposite condition . And control room inside give the stop command into dcs just 1secon relay engage and again normal condition. How can I slove

1682


Calibration procedure for water rotameters

2178


How hart protocol can be connected with control valves?

1027


pls provide me syllabus and old question paper of instrumentation engineering for GET(JSPL)

2239


What is feed factor and its Importance in cement industry? How we can solve feed factor?.

3585


How to work temperature gauge?

1853


How we can check the 2 wire proxy switch? & how it is connected to DI MODULE OF PLC?

2583


In power plant to measure vibration of a turbine we install sensors. Before install this sensor we have to set gap voltage. What is meant by gap voltage and its use?

2057


CONTROL VALVE OPERATING IN MANUAL BUT NOT IN MANUAL. WHAT SHOULD BE THE PROBLEM ?

1872


how to convert MA in to measuring values..and how mwasuring values into MA ?..plz ansr.i have intervw

2642