What is availability check? How can it be done?
Answers were Sorted based on User's Feedback
Answer / jinchandra
It is ATP CHECK,
WHICH IS CARRIED OUT FOR FOLLOWING,
1]MATERIAL
2]CAPACITY
3]PRT
It check the material available in warehouse stock,to
fulfill the planned indpendant requirements.
if not,it checks the missing parts,and evaluates,
Similarly it checks the capacity available.
Is This Answer Correct ? | 9 Yes | 0 No |
Answer / venu
Availability check is used to check whether a product can
be confirmed in a sales order, based on the fact that
enough stock is available or can be produced or purchased
on time.
Is This Answer Correct ? | 6 Yes | 1 No |
Answer / nitin thapliyal
This field has two uses:
1. Specifies whether and how the system checks availability
and generates requirements for materials planning.
2. In Flexible Planning, defines - together with the
checking rule - the different MRP elements that make up
this key figure. The sum of these elements gives the key
figure
It can be done as follows
01 Daily requirements
02 Individ.requirements
CH Batches
KP No check
Is This Answer Correct ? | 3 Yes | 2 No |
How costing is affected the pp?
What is mrp group and what is the use of it?
What are the production process in sap?
What is testing & explain standard testing
What is the use of stock requirement list?
What are all the steps involved in Variant Configuration?
what do you mean by planning time horizon
Explain customer Independent requirement .
What is the use of QM control key?
What is a 'product hierarchy'?
What is planning file entry
What are dynamic actions? Give a few examples. What are it’s you used in them?