What is availability check? How can it be done?

Answer Posted / jinchandra

It is ATP CHECK,
WHICH IS CARRIED OUT FOR FOLLOWING,
1]MATERIAL
2]CAPACITY
3]PRT
It check the material available in warehouse stock,to
fulfill the planned indpendant requirements.
if not,it checks the missing parts,and evaluates,
Similarly it checks the capacity available.

Is This Answer Correct ?    9 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Integration between PP and PM module.

1164


What is the internal recruitment?

577


What is alternative BOM, or diff between BOM group and Group BOM?

1171


Explain how can you create production order without routing and bom?

599


How the processing time is calculated in a wc when both labor, machine categories exist?

591






What is the difference between pp and pp-pi? Which one is better and how ?

823


What does a PP Consultant do in his/her real time?

2337


What is testing & explain standard testing

1442


We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?

590


How requirements( pir,sles order, customer requirement) are reduced after they are produced?

615


Define 'sop' (sales & operations planning)?

712


Explain the process of Material costing.

1225


Why work scheduling view is required for semi-finished and finished products?

641


What is MRP procedure

2182


What is the planning time fence?

601