What is availability check? How can it be done?
Answer Posted / jinchandra
It is ATP CHECK,
WHICH IS CARRIED OUT FOR FOLLOWING,
1]MATERIAL
2]CAPACITY
3]PRT
It check the material available in warehouse stock,to
fulfill the planned indpendant requirements.
if not,it checks the missing parts,and evaluates,
Similarly it checks the capacity available.
Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
Integration between PP and PM module.
What is the internal recruitment?
What is alternative BOM, or diff between BOM group and Group BOM?
Explain how can you create production order without routing and bom?
How the processing time is calculated in a wc when both labor, machine categories exist?
What is the difference between pp and pp-pi? Which one is better and how ?
What does a PP Consultant do in his/her real time?
What is testing & explain standard testing
We need to do gi of components to production order using back-flush. The component stock is managed in batches. The batch to be back-flushed?
How requirements( pir,sles order, customer requirement) are reduced after they are produced?
Define 'sop' (sales & operations planning)?
Explain the process of Material costing.
Why work scheduling view is required for semi-finished and finished products?
What is MRP procedure
What is the planning time fence?