What is availability check? How can it be done?
Answer Posted / jinchandra
It is ATP CHECK,
WHICH IS CARRIED OUT FOR FOLLOWING,
1]MATERIAL
2]CAPACITY
3]PRT
It check the material available in warehouse stock,to
fulfill the planned indpendant requirements.
if not,it checks the missing parts,and evaluates,
Similarly it checks the capacity available.
| Is This Answer Correct ? | 9 Yes | 0 No |
Post New Answer View All Answers
Define mrp group
Can mrp be carried out for one particular level of a bom ( level code : 0001/0002 etc)?
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
What is the role of an administrator in pa?
How requirements( pir, sales order, customer requirement) are reduced after they are produced?
What do you mean by basic dates
Mention what are the keyfields found in mrp view 1?
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
Explain what is sap pp?
Mention what are the production process in sap?
What is the planning time fence?
What is detail scheduling
What happens to plan after it has been converted into production order?
What does a PP Consultant do in his/her real time?
What is SOP and types of SOP?