What is availability check? How can it be done?
Answer Posted / nitin thapliyal
This field has two uses:
1. Specifies whether and how the system checks availability
and generates requirements for materials planning.
2. In Flexible Planning, defines - together with the
checking rule - the different MRP elements that make up
this key figure. The sum of these elements gives the key
figure
It can be done as follows
01 Daily requirements
02 Individ.requirements
CH Batches
KP No check
| Is This Answer Correct ? | 3 Yes | 2 No |
Post New Answer View All Answers
Steps to configure Production order type.
Define standard cost
Where have we to specify the teardown time in one operation?
What is MRP procedure
What is alternative BOM, or diff between BOM group and Group BOM?
What is a ‘bom’?
What is group bom?
In om, how to get the details for a group of employees (ex.) Group of drivers in the organization?
What is activity type and how it works in costing?
How did you configure the payscale structure?
a company needs 12 standard values. how it can be maintained?
What is Phantom Assembly?
What are the customer activities followed for pp module ?
What are the three 'mrp procedures'?
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?