Answer / vinod arya cbre
B check should be done after 6month
C check should be done after 1 year
D check should be done after 6000 hrs.
| Is This Answer Correct ? | 0 Yes | 1 No |
how electronic energy meter works?
why neutral should connect to earth in delta-star type transformer
what is meant by residual over voltage & residual earth fault ?
how the specific fuel consumption of 320 kva deisel genarator set (explain with formulas please)?
What are the types of lighning arrestor protection system? how to choose that according to load?
WHaT IS THE CONCEPT OF INDUCTION LAMPS IN MODERN LIGHTINGS, and HOW IT WORKS TO EMIT LIGHT ( AS NO ELECTRODES ARE PRESENT ) ?" COULD INDUCTION LAMPS CAUSE INTERFERENCE WITH COMUNICATIONS INTO A STORE USING INDUCTION LIGHTING ? WHAT IS THE BENEFIT OF USING THE LOW FREQENCY INDUCTION LAMP , VERSUS LED , AND VERSUS FLUORESCENT, AND VERSUS ANOTHER KIND OF LIGHTING . THANK yOU MOISES GUINDI
Explain Energy and Power signals?
Ceiling Fan and Storage type water heater. Discuss
What should the transformer connection of a 11/220 kV step up and 66/11 kV step down transformer ?
What is the function of Buchholz relay in transformer ?
how we identify between current transformer and potential transformer without having it name plate?
How to calculate impedance volt in Transformer?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)