if 300 hrs not comleted at wat interval b.c,d checks og
take place
Answer Posted / vinod arya cbre
B check should be done after 6month
C check should be done after 1 year
D check should be done after 6000 hrs.
Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What are the advantages of instrument transformer?
Can any body tell me about INNER SHUNT COMPOUND MOTOR diagram?
What is formula calculation size cable wire ?
what is the diff. between x'mer , isolation x'mer & ultra-isolation x'mer ?????????????
l&t switch FN 63 handle position can we change
Define load factor?
How we can determine short circuiting current any plant and for example a plant which power generation is 415 volts and plant load is 500 kw.
I PURCHASED A DEISEL GENARATOR SET OF AVR TYPE& RATING 125KVA BUT SOME TIMES THE OUTPUT VOLTAGE IS FLUCTUATING WHAT ARE THE PROBABLE REASONS GIVE ME
Type of motor stater detail and working detail
while doing high potential for 11KV 3 core cable how much leakage current will obtain?, what will be acceptance value?
Draw a SLD of DG distribution up to main LT panel?
when we have to use UPF wattmeter and LPF wattmeter? what is the difference between UPF and LPF wattmeter in terms of construction?
How does a tertiary winding filter harmonic(espcially 3rd one) from entering into load system?
Cb closed condition if there is a tcs fail whether cb will trip or not
Please explain the following and how these are working with PLC unit 1.I/O Module 2.I/O Device 3.Adaptor Card 4.Ribbon Adaptor 5.RS 485-FC