what is difference between short ckt and overload?
Answers were Sorted based on User's Feedback
Answer / srinivasa rao talasila
Short circuit means the shorting of any two r moro phases.
Over load means any equipment is taking more than the rated
current means we will say it is over loaded.
| Is This Answer Correct ? | 28 Yes | 0 No |
Answer / munissamy.p
Short circuit means any two phases,line to ground,and two
line to ground.That is dead fault,at the time any other
appliances taking unknown current.
Any other electrical appliances taking one or tow times
above the rated current then it is called over load.
| Is This Answer Correct ? | 7 Yes | 1 No |
Answer / sk. rafi ahmed
short ckt is a faulty condition of an electrical ckt where the live conductor gets connected with the neutral conductor or two live conductor of different phases gets connected.
a system is said to b overloaded when a user trys to extract a power more than the rated capacity of the system.
| Is This Answer Correct ? | 4 Yes | 1 No |
Answer / guest
when a load bypassed by a medium ,like phase to ground not
connecting load then electrons flow rate (amp) would be
higher enough to meltsdown the medium.Means load has been
shorted by passing all electrons to ground directly as by
not connecting the load.Overload means when machine ability
to run more than rated load, 1Kva transformer may have
rated load okva but if it reaches (1kva to 1.1kva) then it
is overloaded.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / naveen kumar
when two wire[p\n] is touch one to another is called short circuit and
when the give is extra load is called extra load
| Is This Answer Correct ? | 0 Yes | 0 No |
how dc ct works?
Brief working principle of stabilizer,application & safety precautions
I have 90KW Motor 60 Hz,380V Pf 0,88. after testing the Motor without Load is the no load Current 36 A,but wenn i put load after 2 hours the current increase more than 156 A. Can anybode tell me waht is the Problem?
A 7 storey building has a floor area of 35,000sq.ft on each storey. On the ground floor 11KV electrical sub-station is to be erected. A load of 3kw for every 400sq.ft (p.f is 0.8) is proposed for each floor. fire pump 7.5hp, water pump 5hp, lift 2 nos, each 10hp and 20shop load of each shop is 5kw. calculate a. load each floor b. total load of building c. L.T feeders for aech floor and from transformer to main. d. distribution diagram e. capacity of sub-station/capacitor bank f. line diagram
how do you choose the cable size as per amps rating & the voltage drop for the same.
when u are given a timer,push buttons and contactor, how do i practically make a star delta control circuit and a direct online control circuit?
sugest any typical project ?
how we can set the IDMT relay.
All the voltage drops and the source voltage added together in a series circuit is equal to
What is Difference Between static & Dynamic Pressure of Fan & Blowers
how we identify between current transformer and potential transformer without having it name plate?
explain me the exact concept of generator neutral....????
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)