Our calculated load is 110KW . Normaly, we give 80% load on
DG for best and long opration . DG pf is 0.8.
So DG rating = 110/0.8
= 137.5 KVA
we use 150 KVA or high then.
| Is This Answer Correct ? | 92 Yes | 24 No |
D.G if ac is rated in KVA.Usually the alternator is rated at 0.8 pf. So KW/PF=KVA. 110/0.8=137.9.KVA.
Now the D.G must have some spare power to take care of starting current and a bit of future expansion so we load the D.G at 75%.
137.9/.75=183.8KVA
Now you can buy the nearest available D.G in the market.
Maybe 175KVA or 185 KVA
| Is This Answer Correct ? | 44 Yes | 8 No |
Answer / mahesh sali
FOR 110 KW , SAY AT 0.8 PF.
WE KNOW THAT
KVA = KW/PF
KVA=110/0.8
KVA = 137.5 KVA
ASSUME THAT ABOVE LOAD IS MOTOR
FOR
AS PER NEC SAY THAT
25% EXTRA AS PER NORMS,
I=KVA/1.732*V ASSUME:- V-415 V
I=191.29 AMPS.
THEREFORE,
I = 1.25 * 191.29
I= 240 AMPS.
KVA= 1.732 *240*415
KVA=173 KVA , DEMAND LOAD
AS PER RULE
80% LOADING ON DG SET
KVA=173/0.8
KVA=216 KVA DG SET RATING
AS PER STD.RANGE OF DG SET -725 KVA AT 0.8 PF , 415 V
216
| Is This Answer Correct ? | 16 Yes | 8 No |
CONSIDERING 110kW AS INDUCTIVE OR MOTOR LOAD
Ir (RUNNING CURRENT) WILL BE 110*1000/1.732*415*0.8
Ir = 191.3 AMPS
CONSIDERING MOTOR STARTER AS STAR-DELTA,
Is (STARTING CURRENT) = 3 TIMES OF Ir (RUNNING CURRENT)
Is = 3 * 191.3 = 574 AMPS
IF MOTOR WILL START ON NO-LOAD CONDITION, THEN STARTING
CURRENT WILL ALWAYS BE LESS THAN 574 AMPS
DG SET RATING SUITABLE TO START 110kW MOTOR LOAD IS 365KVA
365KVA DG SET AT 0.8 PF WILL DELIVER 507 AMPS. SINCE DG SET
ENGINES ARE PRIME RATED I.E. AFTER EVERY 12 HRS, DG SET CAN
BE RUN ON 110% LOADING FOR 1 HOUR.
SO, 110% OF 507 = 557.7 AMPS,
HENCE, 365KVA DG SET IS SUITABLE TO START A MOTOR
(INDUCTIVE) LOAD OF 110kW
WILL BE IF MOTOR WILL BE STARTED ON NO-LOADSINCE MOTOR
SHALL START ON NO-LOAD
| Is This Answer Correct ? | 6 Yes | 1 No |
Answer / sahab ram verma
Dear sir Please Help as per Bellow Mention Load For Mahindra DG Set
Ac 1.5 Ton=8
Ac 3 Ton=1
Geyser 4 KW=6
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / bal
Calculated load is 110kw.
considering 10% spare for future load growth
= 110 x 1.10
= 121kw
Operating at 0.8 pf,
= 121/0.8
= 151.25kVA
You can select the next available rating in market.
| Is This Answer Correct ? | 4 Yes | 11 No |
Answer / v.c.k
For the Calculated load of 110KW
for DG Selection,we mush know phase
therefore we consider 3 phase
A=kw*1000/1.732*45
=110*1000/1.732*415
=110000/718
=153A
therefore we select the next higher stage DG, its means
225KVA (If available we choose 175KVA or 200KVA)
| Is This Answer Correct ? | 14 Yes | 29 No |
what do you mean by plant earthing system.
Y phase plates are used in transmission line??? what is there need???
what are the accessories need to be added while doing estimation for the following: 1.MCCB 2.MCB 3.ACB
whats is MARX CIRCUIT?
Is it reuired to use house service barcket for 31/2 core 300 Sq.mm cable,if the distance between pole & shop is around 2 mtrs only or can I hang the cable with GI support in air? upto what size of cable GI serrvice btacket is necessary?
Why are iron cores in transformers made laminated?
is it possible to say motor horsepower number without seeing name plate(when name plate damaged)
What is transient response?
What is the difference between a verilog task and verilog function?
I need bhel previous year quetion papers for electrical engineering department.I searched but i could not find out
WHAT IS SERVO MOTOR
How to select Main CB Rating for 187 KW Load?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)