How to select a D.G set for calculated load of 110kW..?
Answer Posted / sanjay vishwakarma
CONSIDERING 110kW AS INDUCTIVE OR MOTOR LOAD
Ir (RUNNING CURRENT) WILL BE 110*1000/1.732*415*0.8
Ir = 191.3 AMPS
CONSIDERING MOTOR STARTER AS STAR-DELTA,
Is (STARTING CURRENT) = 3 TIMES OF Ir (RUNNING CURRENT)
Is = 3 * 191.3 = 574 AMPS
IF MOTOR WILL START ON NO-LOAD CONDITION, THEN STARTING
CURRENT WILL ALWAYS BE LESS THAN 574 AMPS
DG SET RATING SUITABLE TO START 110kW MOTOR LOAD IS 365KVA
365KVA DG SET AT 0.8 PF WILL DELIVER 507 AMPS. SINCE DG SET
ENGINES ARE PRIME RATED I.E. AFTER EVERY 12 HRS, DG SET CAN
BE RUN ON 110% LOADING FOR 1 HOUR.
SO, 110% OF 507 = 557.7 AMPS,
HENCE, 365KVA DG SET IS SUITABLE TO START A MOTOR
(INDUCTIVE) LOAD OF 110kW
WILL BE IF MOTOR WILL BE STARTED ON NO-LOADSINCE MOTOR
SHALL START ON NO-LOAD
Is This Answer Correct ? | 6 Yes | 1 No |
Post New Answer View All Answers
how to determine motor size for a fan application?
after how many spot we must chang secondry cable in portable spot welding gun?
what is the use of static frequency converter and static excitation equipment? and where it is employed? for what?
hi if anybody got model questions for cpcl Grade'A' electrical engineer position.send it to my mail please krishkumar22@gmail.com
howmany electrician should maintain for a 1000 kva used plant... in kerala..
what is the difference between surge protection capacitor and surge arrestor
How shall i select the value of capacitor or inductor in a system?
What is gross error?
How can we calculate ac current from the given DC current when AC voltage is given?
hi friends i m from electrical branch and seeking for tech. + apti. both papers of hpcl plz get it available as soon as possible
What is the one main difference between ups & inverter ? And electrical engineering & electronics engineering ?
TCS IS IT COMPANY THEN WHY DO THEY NEED ELECTRICAL &ELECTRONICS ENGINEERS?
Hi.. I am a BE GRaduate in E&E. I have 8.5 Experience in Tendering & Estimation field. I have done SAP SD course few years back. But due to some reason i failed to get job in that field and continued my own field. Now I am thinking of changing into SAP seriously. How should i go ahead???
what are your career plans upon completion of the programme and the relevance of recity generation to your professional development?
what is the transiant condition in alternator? and how it can be prevanted?