Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How to find quantity of cement mortar?
I want to know the req quantity of cement for plastering 300
sft in final coat with 12 mm. Any math involved? Plz help

Answers were Sorted based on User's Feedback



How to find quantity of cement mortar? I want to know the req quantity of cement for plastering 300..

Answer / mukul chand

300 sft = 300*0.0924=27.72 sqm
Therefor wet vol. of mortar = 27.72 * 0.012 = 0.33264 cum
Increased by 20% for filling the depression etc.
= 0.33264 + 1/5 0.33264 = 0.4 cum (wet)
= 0.4 + 1/3 0.4 = 0.533 cum (dry)
Summation of proportion = 6+1 = 7 (1:6)
Therefor cement require = 0.533/7 = 0.761 cum.
Or 0.761 * 1440 = 109.71 kg.

Is This Answer Correct ?    34 Yes 5 No

How to find quantity of cement mortar? I want to know the req quantity of cement for plastering 300..

Answer / sateesh patil kris cooper pmc

Your Area is=27.87 Sqmt
Thickness is=0.012m
Total=27.87X0.012=0.33 Cum

25% of Dry Mix=25/100X0.33=0.0825 Cum

30% of Wet mix is=30/100X0.33=0.099 Cum

Total=0.33+0.0825+0.099=0.5115 Cum

If your Mix proption is 1:4 then you do

0.5115/(1+4)=0.1023

1 Part of cement is 0.1023X1=0.1023 Cum/0.035 Cum=2.92 Bags

Sand is 0.1023X4=0.4092 Cum=14.43 Cft

Is This Answer Correct ?    24 Yes 4 No

How to find quantity of cement mortar? I want to know the req quantity of cement for plastering 300..

Answer / indhumathi

cement required=96.192
it depends on the mix ratio.i give the quantity for c.m 1:5
area to be plastered=27.87sq.m(300 sq ft)
thickness of coat=12mm
volume of mortar required=27.87*.012=.334m3
sand required for .334m3=.0334m3
cement required=(weight of cement in 1m3/mix ratio)*total
volume
=(1440/5)*.334=96.192kg

Is This Answer Correct ?    49 Yes 31 No

How to find quantity of cement mortar? I want to know the req quantity of cement for plastering 300..

Answer / sachin sharma

Total Volume =(300/10.76)*.012=0.334cum
Increase 55% for dryness factor and unevenness
=1.55 * .334
=0.52CUM
Consider mix 1:6
Cement Content=(0.52/7)*28.8
=2.14 Bags

Is This Answer Correct ?    13 Yes 4 No

How to find quantity of cement mortar? I want to know the req quantity of cement for plastering 300..

Answer / rafeek shehu ibrahim

Mixing ratio 1:5 12mm thickness
Add 25% for Unevenness volume of wet mortar
Add 30% for Dry mix Volume
so, 55% is to be added
=300/10.76*0.012
=0.334m3 wet mortar need for 300ft2/27.88m2(12mm thick)
so,Dry volume=0.334+0.334*55%
=0.517m3
red Cement=(volume of Dry material/summation of proportion)
----------------------------------------------
Volume of 1bag Cement
=(0.517/6)
--------
0.035(volume of 1 Bag of cement)
Answer =2.46Bags

Is This Answer Correct ?    10 Yes 1 No

How to find quantity of cement mortar? I want to know the req quantity of cement for plastering 300..

Answer / sjtbehera

ans- you told 300sqft and 12mm th. Ratio is 1:6

convert 300 sqft = 27.77 sqm
= .012x 27.77= .333cum
= .333+1/5x .333 = .399 this is done for 20%
increase in volume mortar for joints depression and wastage
= .399+1/3 x .399 = .532 cum this done when mortar
increase 1/3ed volume when dry.
Than calculating cement = .532/7 = .076 cum = 2.1 bags
where as 1 bag= .0347 cum
7 is the summation of 1:6 ratio

sand - .076 x 6 = .456 cum

Is This Answer Correct ?    17 Yes 10 No

How to find quantity of cement mortar? I want to know the req quantity of cement for plastering 300..

Answer / er.puspk kumar sahu

area of plastering=300sq.ft=300/10.76=27.88sq.mt
thickness of plaster=12mm=0.012m
ratio of mortar=(1:6)summation of ratio=7
total volume of cement plastering=(27.88x0.012)cum
=0.334cum
0.334+55%=0.517cum(extra 55% for dry material )
cement=0.517/7=0.073cum
0.073/0.035=2.08bags(1 cum cement volume perbag=0.035cum)
sand=0.517/6=0.086cum=3.07

Is This Answer Correct ?    9 Yes 3 No

How to find quantity of cement mortar? I want to know the req quantity of cement for plastering 300..

Answer / mohammed aijaz hussain

Volume of Wet Mortar = 12 mm X 300 cc.ft.
= 12/1000 X 300/10.76
= 0.335 cu.m.

Add 20% for depressions, joints and wastage:
= 0.067+0.335
= 0.402 cu.m.

Volume of Dry Mortar = 1.3 X 0.402
= 0.523 cu.m. = 18.45 cu.ft.

Is This Answer Correct ?    7 Yes 1 No

How to find quantity of cement mortar? I want to know the req quantity of cement for plastering 300..

Answer / k pramod

wet mixed mortar for uniform layer =1.2cu. m
adding 30% to fill up joints,uneven surfaces,etc.,the
quantity becomes to 1.2+.36=1.56.
increasing by 25% the total dry volume =1.95cu m== 2.00cum
For, 1:6 cement sand ratio =2/(1+6)=.3
sand =.30*6=1.8cu m ,say =2.0cu m...
no of cement bags requiered are=9

Is This Answer Correct ?    21 Yes 16 No

How to find quantity of cement mortar? I want to know the req quantity of cement for plastering 300..

Answer / muhammad farid

If ratio of plaster is 1:5 & thickness is 12mm

Dry material is 300/10.76x0.012=0.334cm
Wet material for plaster 1.30x0.334=0.434cm
Cement req. 0.434/6x35.31=2.55 cft or 102.16kg or
2.04Bags of 50kg

Is This Answer Correct ?    6 Yes 1 No

Post New Answer

More Civil Engineering Interview Questions

While calculating the weight of the steel per running meter, the formula used is [(dxd)/162]. Why 162 is used in denominator & how it is derived?

0 Answers   ARS,


what is the density of the polythene sheet

2 Answers   NCC,


what are all the new civil construction materials?what are the new concepts ?

2 Answers   Essar,


8mm.2l@7" c/c in footing column drawing,mean of 2l,4l in the Column drawing please answer give with example,thankyou,

2 Answers   L&T,


in staad pro. modelling for a parallel scissors chord truss, when i assigned roller support i.e fixwd but with all Fx, FZ, Mx, My and Mz release except Fy... the analysis results " in stability at a joint, with direction Mx or My..what could be the reason...anyone please explaing

0 Answers  


what is a pitot tube

5 Answers  


for preparing 10cum of 1:4:8 cement concrete the requirement of sand is 0.7cum 2.8cum 4.74cum 18.40cum & how

1 Answers  


how can i determined the size of burfi ring?

1 Answers   Interior Designs, Simplex,


what is difference between long column and short column?

16 Answers   L&T, Tomi Polytechnic,


what is FPS brick

2 Answers  


What is design life of a bridge?

3 Answers  


how we can calculate the quantity of sand & cement & also Aggregate so give me to this answer for a slab Length is : 25' /3.28 = 7.62 Mtr Width is : 30' /3.28 = 9.14 Mtr Depth is : 0.6"/3.28 = 0.15 2Mtr

3 Answers   Lotus,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)