1. How do you handle non-productive team members?
Answers were Sorted based on User's Feedback
Answer / bala
*Need more information.
1.R u on their side like one of the team member, r
2.R u the one to lead them, r
3.R they opponent 2 u (like Site.Eng Vs QC.Eng ).
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / m.a.muqtadar
1. Trained them
2. Encourage them
3. Supervise them
4 Keep him under observation of a skilled foreman
5. Be committed to them.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / venkata appa rao
I am tackling this question as if your are the team lead.
1. Asses his strengths and weaknesses.
2. Asses his present condition is due to demotivation, lack of motivation or inadequate motivation?
3. Is he not able to fit into this team or there is a temporary slump in his Performance.
4. sit with him and counsel him about his performance or lack of it.
5. If after all this he does not come up in performance change his duties after ascertaining about his aptitude.
6. Counsel him as to how and why of his present inadequate performance.
| Is This Answer Correct ? | 1 Yes | 0 No |
1.we have to observe them initially 2 test their grasping
power 3 explain them n number of times ask and enquire where
they are lagging behind 4 give ample of time 5 finally
insist them to do lastly maintain principle perform or perish
6 telling him he will be rewarded for his work and deication
| Is This Answer Correct ? | 0 Yes | 0 No |
How steel required for 823 sqm of flooring work in 150mm c/c in single jali?
What is the consumption of Brick in one meter cube both 6inch & 4inch thick
how to take quantity of steel per cum in columns
2 Answers ERRA, Skyline Builders,
rcc floor to floor 4m. in column reinforcement where we provide lap in exact location.
How to calculate plastering for elevated water storage tank
what are co-efficient for jacks, acro spans and runners for slabs per sft?
The resultant upthrust on a body partially immersed in a liquid acts through?
5 Answers TNPSC Tamil Nadu Public Service Commission,
what is the procedure of wet seiving. n percentage of silt in different type of soil?
What is gauge and gage
What is cold joint, what will happen due to cold joint?
How to know proportions of cement, sand, aggregate in different types of grades like M5, M10, M20, M30?
How do you calculate qty for form work like props shuttering sheet and acro span for residential block ? for Example: 10 sq mt what is the material and qty require to do form work.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)