1. How do you handle non-productive team members?

Answers were Sorted based on User's Feedback



1. How do you handle non-productive team members?..

Answer / bala

*Need more information.
1.R u on their side like one of the team member, r
2.R u the one to lead them, r
3.R they opponent 2 u (like Site.Eng Vs QC.Eng ).

Is This Answer Correct ?    1 Yes 0 No

1. How do you handle non-productive team members?..

Answer / m.a.muqtadar

1. Trained them
2. Encourage them
3. Supervise them
4 Keep him under observation of a skilled foreman
5. Be committed to them.

Is This Answer Correct ?    1 Yes 0 No

1. How do you handle non-productive team members?..

Answer / venkata appa rao

I am tackling this question as if your are the team lead.
1. Asses his strengths and weaknesses.
2. Asses his present condition is due to demotivation, lack of motivation or inadequate motivation?
3. Is he not able to fit into this team or there is a temporary slump in his Performance.
4. sit with him and counsel him about his performance or lack of it.
5. If after all this he does not come up in performance change his duties after ascertaining about his aptitude.
6. Counsel him as to how and why of his present inadequate performance.

Is This Answer Correct ?    1 Yes 0 No

1. How do you handle non-productive team members?..

Answer / sivaramkrishna

1.we have to observe them initially 2 test their grasping
power 3 explain them n number of times ask and enquire where
they are lagging behind 4 give ample of time 5 finally
insist them to do lastly maintain principle perform or perish
6 telling him he will be rewarded for his work and deication

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

quantity of cement required for M35 grade reinforced cement concrete

3 Answers   OCC,


how to calculate the value of 162?

2 Answers   GKC Projects Limited GKCPL, L&T, OPG,


Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete

0 Answers  


what is the definition of stress& strain.

1 Answers   PBL,


concrete strenght is increased if using sisal fibre in concrete?

1 Answers  






how much quantity of work we can get by rod benders per day

3 Answers   IVRCL, NCC, OWDM,


How many nos. are Contains fly ash Brick in one Cubic meter ?

3 Answers  


Define angular dimension?

0 Answers  


How to Calculate in measurement RCC Colo um Spred design for Billing

1 Answers   JMC Projects,


How t find the quantity of materials required for construction of a wall of length 10x5x0.2

2 Answers   NCC,


For M30 grade how much cement bags will need for one cubic meter qty

1 Answers  


why we leave expansion joint between to complex

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)