1. How do you handle non-productive team members?
Answers were Sorted based on User's Feedback
Answer / bala
*Need more information.
1.R u on their side like one of the team member, r
2.R u the one to lead them, r
3.R they opponent 2 u (like Site.Eng Vs QC.Eng ).
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / m.a.muqtadar
1. Trained them
2. Encourage them
3. Supervise them
4 Keep him under observation of a skilled foreman
5. Be committed to them.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / venkata appa rao
I am tackling this question as if your are the team lead.
1. Asses his strengths and weaknesses.
2. Asses his present condition is due to demotivation, lack of motivation or inadequate motivation?
3. Is he not able to fit into this team or there is a temporary slump in his Performance.
4. sit with him and counsel him about his performance or lack of it.
5. If after all this he does not come up in performance change his duties after ascertaining about his aptitude.
6. Counsel him as to how and why of his present inadequate performance.
Is This Answer Correct ? | 1 Yes | 0 No |
1.we have to observe them initially 2 test their grasping
power 3 explain them n number of times ask and enquire where
they are lagging behind 4 give ample of time 5 finally
insist them to do lastly maintain principle perform or perish
6 telling him he will be rewarded for his work and deication
Is This Answer Correct ? | 0 Yes | 0 No |
quantity of cement required for M35 grade reinforced cement concrete
how to calculate the value of 162?
2 Answers GKC Projects Limited GKCPL, L&T, OPG,
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
what is the definition of stress& strain.
concrete strenght is increased if using sisal fibre in concrete?
how much quantity of work we can get by rod benders per day
How many nos. are Contains fly ash Brick in one Cubic meter ?
Define angular dimension?
How to Calculate in measurement RCC Colo um Spred design for Billing
How t find the quantity of materials required for construction of a wall of length 10x5x0.2
For M30 grade how much cement bags will need for one cubic meter qty
why we leave expansion joint between to complex