1. How do you handle non-productive team members?
Answers were Sorted based on User's Feedback
Answer / bala
*Need more information.
1.R u on their side like one of the team member, r
2.R u the one to lead them, r
3.R they opponent 2 u (like Site.Eng Vs QC.Eng ).
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / m.a.muqtadar
1. Trained them
2. Encourage them
3. Supervise them
4 Keep him under observation of a skilled foreman
5. Be committed to them.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / venkata appa rao
I am tackling this question as if your are the team lead.
1. Asses his strengths and weaknesses.
2. Asses his present condition is due to demotivation, lack of motivation or inadequate motivation?
3. Is he not able to fit into this team or there is a temporary slump in his Performance.
4. sit with him and counsel him about his performance or lack of it.
5. If after all this he does not come up in performance change his duties after ascertaining about his aptitude.
6. Counsel him as to how and why of his present inadequate performance.
| Is This Answer Correct ? | 1 Yes | 0 No |
1.we have to observe them initially 2 test their grasping
power 3 explain them n number of times ask and enquire where
they are lagging behind 4 give ample of time 5 finally
insist them to do lastly maintain principle perform or perish
6 telling him he will be rewarded for his work and deication
| Is This Answer Correct ? | 0 Yes | 0 No |
What is the meaning of soil reinforcement?
resins are not soluble in water soluble in spirit used in varnish left behind on evoporation of oil
HOw many cement bags are required for M35, M40 & M45 grade of concrete?
How to calculate the wall thickness of building?
How calculate the Paint quantity for a wall?
How much cost will come for 900 sq ft cement plastering
whats the difference between young's modulus,stress and pressure.they have same unit
How to do rate analysis for concrete work including shuttering work?
0 Answers DBM, Techno Solutions,
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
If drainage is main things then which respect the super Elevation may be provided?
one steel fixers how much ton steel fabrication he will do same how much tone he will binding?
How we can calaculate materials required for block work(1m3) block size 33cm x 20 cm x 17 cm, mortar 1:6
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)