1.how to calculate the nails qty in shuttering of column,beam, shear wall.
2.how control the binding wire wastage in building project.
3.
Answer / ratheesh
.750grms to 1Kg nails for 1sqm shuttering.
u can use single binding wires
| Is This Answer Correct ? | 2 Yes | 2 No |
How to calculate the crank length of the rod in beam? Please give me a details.
10mm Rebar total 12meters length how to calculate ?
what is difference between long column and short column?
16 Answers L&T, Tomi Polytechnic,
How much steel required for only ground floor of 1600 Sq foot.Having general structure ?
Why we are not provide bar in the centre of the column and bar?
draw the sfd and bmd of catilever beam subjected to point load and udl. plot graphically the difference in deflection pattern of simply supported and cantilever beam subjected to point load.
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
Prop carrying load capacity
which grade of concrete is the strongest? M20,M25,M30,M35 or M40?
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
Pl. enlighten whether M20 grade RMC is suitable for columns & beams for 5 storied residential building
How to calculate chejja reinforcement
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)