Answer / poorna
measuring box should be equal to volume of cement bag (0.035cum)
| Is This Answer Correct ? | 5 Yes | 1 No |
Measuring cement box size equal is 25*35*40 cm equal to .25*.35.*.40 m =0.035 cum
| Is This Answer Correct ? | 4 Yes | 0 No |
How could I calculate quantities of fine aggrigates(sand) & coarse aggregates in pcc M15
1 Answers Coromandel, RECPDCL,
what are the major benefit in auto level?
what is procedure of ordinary pile foundation detial?
qty. of cement & sand required (100sq.mtr) for fixing of floor and wall tiles also fixing of marble stone on the floor
at the beam-column junction point tell me how much beam bars should pass through column ring ? 3 or 2 or 1 . answer with reason. if it is not happen then what will be he effect ?
1. How do you handle non-productive team members?
what we do if excavation is more than actual requirement
what is IS CODE in concrete tiles
What material should be used for casting the beam-column junction if beams and columns are of different grades?? For example concrete in beams and Columns is M20 and M25 respectively.
What is ideal location for cube casting, RMC vehical at Ground Floor and Slab casting at 40th Floor
what is the difference between gypsum and pop?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)