how do make a measuring box for 1 cubic metre of 1:2:4
concrete for 350kg
Answers were Sorted based on User's Feedback
Answer / poorna
measuring box should be equal to volume of cement bag (0.035cum)
| Is This Answer Correct ? | 5 Yes | 1 No |
Measuring cement box size equal is 25*35*40 cm equal to .25*.35.*.40 m =0.035 cum
| Is This Answer Correct ? | 4 Yes | 0 No |
How to test the quality of Ready Mix M20 concrete (1:1.5:3) before casting at site when lorry arrives? Are there any methods?
For a washout valve why are two gate valves required in normal practice?
which type of test carrying on the cement & why
what is minimum dimension for the kitchen & bed room
can any one tell me in detail footing estimation .. i am new here in dubai so facing lots of problem...
0 Answers Golden Bridge Contracting,
How to find CN by using arcgis 9.3?
why we take cube depth 150mm for testing
why elongation index is not required for concreteing coarse aggregate..
1. why steel used in concrete
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
Is 456 revised lastly in which year? & What are the revisions?
What is the Roll of Water Bonding under VDF road?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)