How to find quantity of cement mortar?
I want to know the req quantity of cement for plastering 300
sft in final coat with 12 mm. Any math involved? Plz help
Answer Posted / k pramod
wet mixed mortar for uniform layer =1.2cu. m
adding 30% to fill up joints,uneven surfaces,etc.,the
quantity becomes to 1.2+.36=1.56.
increasing by 25% the total dry volume =1.95cu m== 2.00cum
For, 1:6 cement sand ratio =2/(1+6)=.3
sand =.30*6=1.8cu m ,say =2.0cu m...
no of cement bags requiered are=9
| Is This Answer Correct ? | 21 Yes | 16 No |
Post New Answer View All Answers
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
questions with answers to face an interview of an civil engineer regarding RCC buidings
what is the formula to find the diagonal shape stirrups?
What is meant by cad?
The 4 main factors to start a construction project are––
explain the advantages of total stasion
How to measure the requirement of cement n sand for 12mm and 20mm plastering thanks in advance
How many days should curing of plastering, brick work and concrete
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
please send me bhel questions on rupesh.017@rediffmail.com
115mm thickness brick work how to required mortar
if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?
a rectangle grill of length 72 inch x 20 inch width.how to calculate bar spacing ,bar consist 8 mm thickness and spacing of bar is 2 inch.. calculate no of bar with formula
What is eccentricity in laymans term Can't understand bookish language .please explain in easy way.
length where bent up is made in slab of bridge from one end