Answer / dfgds
Number flip flops requires depends on following formula.
2^(N-1)<number required <2^N
so to count 16 numbers the required flip flops are
4.(considering 0 as first number to 15 as last number).
| Is This Answer Correct ? | 56 Yes | 5 No |
Answer / arindam
it 16bit counter not 16 state counter......so ans is
16....not 4
| Is This Answer Correct ? | 13 Yes | 1 No |
Answer / jatinderpal singh
the no of ff is for 16 bit counter is 4
boz...
to get 16 bit counter we take 2raise to power 4 ...or genrally
2 raise to power n where n represents number of ff,,
| Is This Answer Correct ? | 11 Yes | 4 No |
Answer / jg
The question asks for 16 bit counter, NOT 16 states
counter. Therefore, the number of flip-flops required is
16.
| Is This Answer Correct ? | 8 Yes | 5 No |
Answer / tanvi
2 to the power n..gives the number of the flip flops
| Is This Answer Correct ? | 2 Yes | 1 No |
Answer / prashant
according to formula
2^n<=N
where n is the power and N is no. of bit for a counter u required.
this implies u need 4 flip flops...
| Is This Answer Correct ? | 2 Yes | 2 No |
Answer / narasimhan
no.of states =2^n=no.flipflops(n);so 4 fp can be used to
make 4 bit ripple counter
| Is This Answer Correct ? | 0 Yes | 1 No |
Answer / prosenjit majumder
To get 16 bit counter you need 16 no. of flip-flops .
| Is This Answer Correct ? | 22 Yes | 33 No |
What types domain of laplace transforms? What behavior can laplace transform predict how the system work?
what is the relationship between phase & neutral
difference between load bus and dead bus?
What is the difference between Split ring and slip ring?
What is the difference between Dielectric and Insulator
why we test the core balance of the transformer?
What is Primary And Secondary Injection Test of Relay and Other Electrical Devices. How IT is carried out.
How CFL &T5 tube light glows?
i want to learn control schedule for 11kv panel? can any one send the detailed control schedule?
Why indicated only R.Y.B to phase.
L&T ACB C-POWER OF 800A FAULS TRIPING AT THE TIME OF 110KW MOTOR STARTS WITH EARTH FAULT RELEASE
What happen if LV supply is fed to a HT motor?
19 Answers ITC Infotech, Jindal,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)