Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


11kv/0.433kv, 2 mva , transformer , for protection and
metering how many CT/PT are required?

Answers were Sorted based on User's Feedback



11kv/0.433kv, 2 mva , transformer , for protection and metering how many CT/PT are required?..

Answer / shailesh taware

1 CT WITH 3 CORE
1st CORE FOR O/C & E/F PROTECTION
2nd CORE FOR METERING WITH INSULATION CLASS 0.5
3rd CORE FOR DIFFERENTIAL PROTECTION
1 PT WITH 2 CORE
1st CORE FORE O/C & E/F PROTECTION
2nd CORE FORE METERING

Is This Answer Correct ?    10 Yes 3 No

11kv/0.433kv, 2 mva , transformer , for protection and metering how many CT/PT are required?..

Answer / rakesh

3 ct for metering ,3 ct for protection,3 pt

Is This Answer Correct ?    11 Yes 6 No

11kv/0.433kv, 2 mva , transformer , for protection and metering how many CT/PT are required?..

Answer / priyadharisini

3 nos of CT/PT required

Is This Answer Correct ?    6 Yes 3 No

11kv/0.433kv, 2 mva , transformer , for protection and metering how many CT/PT are required?..

Answer / manjunath kunigal

one set of tertiary winding CT/PT is sufficient for both
metering and protection.

Is This Answer Correct ?    11 Yes 9 No

11kv/0.433kv, 2 mva , transformer , for protection and metering how many CT/PT are required?..

Answer / sandeep

3 CT/1 PT

Is This Answer Correct ?    5 Yes 4 No

11kv/0.433kv, 2 mva , transformer , for protection and metering how many CT/PT are required?..

Answer / senthil kumar

06CT and 03PT'S

Is This Answer Correct ?    3 Yes 2 No

11kv/0.433kv, 2 mva , transformer , for protection and metering how many CT/PT are required?..

Answer / k n naidu

hi,
one three phase set of PTs for both protection & metering
and one three phase set of CTs with two secondary cores one
for metering and protection are required.

Is This Answer Correct ?    1 Yes 0 No

11kv/0.433kv, 2 mva , transformer , for protection and metering how many CT/PT are required?..

Answer / mubanga mulenga

You need:

1)Inst., o/c, Metering & EF - 3 CT's

2) REF - 1 CT

3)SBEF - 1 CT

Is This Answer Correct ?    1 Yes 0 No

11kv/0.433kv, 2 mva , transformer , for protection and metering how many CT/PT are required?..

Answer / vikas chauhan

3 no CT (Double core) for 11 kv side for protection and
metering
3 no CT (Double core) for 0.433 kv side for protection and
metering
11/.110 KV 3 phase PT for 11 KV side
secondry side(.433KV side) phase directly connected for
Metering & select relays for .433 KV secondry voltage.
if you select differencial rotection
3 nos CT for Primary and 3 No CT for Secondry side and
interposing CT for Match and neutralise the current in
relay.

Is This Answer Correct ?    1 Yes 0 No

11kv/0.433kv, 2 mva , transformer , for protection and metering how many CT/PT are required?..

Answer / d ramesh

11KV side(delta)
Line side 3core CT :1No. for metering, O/C&E/F protection,
Differential protection with ICT.

0.433KV(Star)
Nuetral CTs :1core for Standby E/F 5p20
Line CTs :3core CT:1No for metering, O/C&E/F
protection,Differential protection with ICT.

1No. 1-core CT in LV nuetral of Transformer of class 5P20
for earth fault protection.

panel side in the panel itself remaining CTs can be
provided for metering, O/C&E/F, and differential cores with
ICT. In both HV panel & LV panel.

Is This Answer Correct ?    2 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

what is the difference between servo voltage stabilizer and general voltage stabilizer?

1 Answers  


Going in for a three phase motor or a single phase motor, what factor should be considered for this? For eg., to pump water to certain height and such domestic applications, which motor is suitable?

1 Answers  


Is there is any hazard to insulation of 3hp motor 5 KV megger is used for it?

1 Answers  


can u please tell me how VFD(variable frequency) drive is used as a energy saver....?

12 Answers   Essar, Oracle,


what does mean of RCT and STR in diffrential CT?

0 Answers  


IN 500 KVA TRANSFORMER 11KV/415 VOLTS HOW TO CALCULATE THE HT CABLE SIZE AND LT CABLE SIZE FROM TRANSFORMER TO LT PANNEL. AND HOW MANY MAINSWITCHES OR MCBS WITH RATING ARE TO BE PROVIDED

2 Answers   BSF,


What will be the current rating of Main switch for 80 kVAR panel

1 Answers  


when is the Ohms law is applicable?

11 Answers   ABB,


why we use copper earthing for neutral while for body GI.

1 Answers   Chennai Metro Rail Limited CMRL, Valeo Lighting Systems India Private Limited,


can any one help me out by posting something related to rvnl interview for site engineer electrical.? what is the procedure? what kinda question they ask us? how long the interview goes? and any tips? and any thing you want to share?

1 Answers   RVNL,


Dear all: Recently we got a question about Interface between PMS and SAP-PM.once we got a update message from PMS.we should set the deletional flag for functional location in SAP system.Is there any FM or BAPI to use?There are only functional location create and change provided by SAP. Best regards!

0 Answers  


What kind of socket shall be provided for window type air conditioner with cooling capacity upto 18000 BTU/hr

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)