Answer Posted / manjunath kunigal
one set of tertiary winding CT/PT is sufficient for both
metering and protection.
| Is This Answer Correct ? | 11 Yes | 9 No |
Post New Answer View All Answers
what is sevice settings for mccb?How can be it setted?
Can XLPE/SWB/PVC (P3) 7C X 2.5mm2 be replaced by Can XLPE/SWB/PVC (P2) 7C X 2.5mm2??? P3 vs P2
What is “pu” in ee?
What is the breaking capacity of transformer and how can we calculate the breaking capacity of tranformer
description about dry type transformers
Is it required to lay 2 runs of GI wires along with armoured cables from one power DB to another Power DB?
WHY IN AC DRIVES,INPUT PHASE CURRENT SHOW UNBALANCE?
Why the efficiency of generator is more than motor in swinburne's test
What is a difference between indoor transformer and outdoor transformer of same rating
what is the main parts of transformer? how it is functioning? pls giv the ans briefly.
anyone please send transformer parameter design formulas & details of tap changer ? plz i have interview this week its more helpful for me ?
How many methods use the load flow solution?
how external lighting design? please give examples?
Which contains in POLE ASSEMBLY of a 11KV Kirloskar-make SF6 (Model No-FP620A12)? Will u clarify with drawing?
in our all power plant have connected in grid and grid voltage and plant voltage is same, but as per as electrical concept the power will transmit from high potential to low potential but here altough same,then how power transmit from power plant to grid.