11kv/0.433kv, 2 mva , transformer , for protection and
metering how many CT/PT are required?
Answer Posted / manjunath kunigal
one set of tertiary winding CT/PT is sufficient for both
metering and protection.
Is This Answer Correct ? | 11 Yes | 9 No |
Post New Answer View All Answers
What are test values for an 63 KVA and 100 Kva Distribution Transformers for the following typical tests 1)Magnetic balance 2)Short circuit test 3)Open Circuit test 4)Vector group confirmation test .please give me the standard values for all the above tests.
what is the difference between pvc & fiber glass cables
what questions will be asked for 11/33KV licence interview APSEB hyderabad. Can any one share question and answers.
How do you compute voltage drop and cable size over distance?
Please explain me about Relay curves and their sources to read ?
fuel-air ratio in a petrol engine fitted with suction carburettor,operating with dirty air filter as compared to clean filter will be
Swg formulae
Is there any abbrevation for STUB in Stub bus protection
why use phase displacement in transformer.and effect of phase displacement on transformer
why is the power generator connected as star earthed or star earthed through reactance and what its features ?
how freewheeling diode improves the powerfactor
why using transformer and thyristor switch in 3 phase apfc panel
detailed procedure how we calculate cost for pcc m10 and rcc m20 including centering and labour excluding steel/ iron
Why i receive the GCU fault in my DG Sychronization panel . what all the factors considered for this fault .
Can anybody post questions asked in Engineers India Limited Interview? Thanks in advance.