11kv/0.433kv, 2 mva , transformer , for protection and
metering how many CT/PT are required?
Answer Posted / rakesh
3 ct for metering ,3 ct for protection,3 pt
Is This Answer Correct ? | 11 Yes | 6 No |
Post New Answer View All Answers
if we install two earth pits with a clear space of 5m without any interconnection,by checking the digital multimeter will it show continuity between earth pits? If so what would be the approx. value
Define bibo stability.
what is the meaning of 5% droop or 7% droop in AVR?
Which type of a.c motor is used in the fan (ceiling fan, exhaust fan, pedestal fan, bracket fan etc) which are find in the houses ?
Maintenance of transformer???
What is the emf equation of a transformer?
Why is it prefer to initiate circuit breaker failure by "86" lockout relay not by "94" tripping relay ?!
How to calulate Locked rotor amper(LRA) for compressor type motors?
what is difference between 5A and 100A CT constructional wise and operation?
what is the meaning of neutral displacement ???
Advantages of using generator circuit breaker (GCB) scheme in a power station ?
IF TVM OF TRANSFORMER SHOWS POWER FACTOR ON 33 KV SIDE AS 0.97 LAGGING AND ON 132 KV SIDE IS 0.75 LEADING.IS THIS CORRECT.WHERE IS PROBLEM.
I am experienced with house and industrial wiring but I don't have any licence how can I apply an licence and which type of licence i can get i didn't complete deee just only experience
What do you mean by dependent and independent voltage sources?
sir& friends i want the collection of recent quetions asked in interview of top most companies please send me on my email san.jsr@hotmail.com