11kv/0.433kv, 2 mva , transformer , for protection and
metering how many CT/PT are required?
Answer Posted / priyadharisini
3 nos of CT/PT required
| Is This Answer Correct ? | 6 Yes | 3 No |
Post New Answer View All Answers
Why hydropower is called renewable source of energy?
List the power rating of any 5 important electrical appliances used in houses.
I HAVE A 50A MCCB AS PER DESIGN LINE WIRE CONNECT UPWORD SIDE AND LOAD IS CONNECTED TO DOWNWARD SIDE TO THE MCCB.IF NOW ANY ONE CHANGE SUPPLY & LOAD(WISEVERSA) WHAT HAPPENS ? DOES MCCB OPERATION OR WORKING FUNCTION NORMAL IF YES THAN WHY THERE ARE MARKED LINE & LOAD ON MCCB.
How should i design a 1ph & 3 ph transformer. Kindly let meknow all steps and formulaes related to design from scratch.
how can service sitting be setted for MCCB?Example for sittings IR (CURRENT RATING),IS(CURRENT STARTING)IO (current operating
kindly send me 11KV MV motor differential protection procedure by primary injection method.
What are the temperature elements?
what happen when we add mentos in cold drink?& why?
how to determine the inrush current of a transformer
What is the formula for calculating the Instantaneous Short Circuit & overcurrent for any breaker
i need the curve duty cycle and amper for (150 kva @50% dyty cycle) transformer turn ratio :19 and vin 400
Cb closed condition if there is a tcs fail whether cb will trip or not
1)What is a Triode? What are its uses? 2) What is a Triac? 3) What is a Thyristor?
What kind of maintenance is conducted for Transformer
why current is constant on d.c?