In sales order how system does picks up plant?
Answers were Sorted based on User's Feedback
Answer / sarinvaibhav
system looks in the fashion
1)Customer material Info Record
2)Customer master record
3)Material Master Record
Is This Answer Correct ? | 30 Yes | 0 No |
Answer / ramesh.doddaga
Plant determination will be happend as give ,
1) Plant from Cust.Met.Ifor.Record.
2) Plant from CMR
3) Plant from MMR.
4) Plant from Sales Order(Manual)
Is This Answer Correct ? | 8 Yes | 3 No |
Answer / kani
I need a clarification on this...
We say that system picks plant from CMIR.
But can anyone tell me where we mention plant in CMIR.
I know the TCODe but there we only mentiond customer and material details.
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / manoj kumar guin
System gets plant as per the below master data:
1st--CMIR
2nd--CMR
3rd--MMR
Thanks
Manoj kumar guin
(9176591455)
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / manoj kumar guin
System 1st picks plant from CMIR ,thenMMR,and thenCMR .
Is This Answer Correct ? | 2 Yes | 9 No |
Answer / ven
As we assign particular material master to particular
plant it picks up from there.
Is This Answer Correct ? | 2 Yes | 14 No |
what is servive desk or help desk ?
How do you assign movement type?
Copying is not possible. because an entry is missing in Table TVCPL: TA TAN Message No. VL473
Hi can any body tell me about SAP testing
in sto what we give as client ? if we give.. what id the process of sto ?
In material master what are all the client views and plant views, pls answer this question thanks in advance
How to maintain number ranges for sales document types?
what is L2 and L3 tickets in SLA......
What is the functionality of negative posting in Billing document?
what is the usage of pricing date in condition type pr00
What do you mean by POD(proof of delivery) what is the use of pod? What are the con figuration you done in your project?
Over head cost controlling component enables you to plan, allocate, control and monitor overhead costs. which of the following fall under over head cost controlling? a)Cost element accounting b)Cost center accounting c)Internal Orders d)Activity based costing e)Plant based costing.