How do you transfer request from Development instance to
production or quality instance?
Answers were Sorted based on User's Feedback
Answer / riyaj
as per my knowledge what shilba_sap told is right.
But iwant elaborate bit more.even though the process is
same as said by shilba.
Whatever the configuration done by da consultant and he
saves that configuration automatically system will generete
one request (in Ver 4.7c and above).All the configuration
what v did in the development server is stored in this
request.wen v want to test this configuration,it should be
transferred to quality server which is done by BASIS
consultants.
Process:
Tcode-Se09/10, select our request which v want to release to
Basis guy, n then choose the release buttion(lorry icon)
that means now itz ready to release for basis guy
from dev to quality
Tcode- STMS(Sap Transport Management System),he ll find all
released requests by the consultants.Now he choose the our
request and transeferred it to quality.
There we will do the testing like whether outcome result is
met with expected result or not.
if the testing is successful.then by the similar process
above basis guy transferred the configuration to production
server.
and u send the mail to enduser and tell him to use
it.after using n that configuration running successfully
enduser will send you the return mail stating that your
configuration is working properly.
Now again you send the mail to concerned person(TL
or PL)with the enduser's mail as attachment.
then they will close that ticket.
i.e. da process to close the ticked (as per my Knowledge and
how am closing the tickets)
for all the above mails we are using Outlook Express.
*any queries welcome
Yahoo Id: ari_819 -------Raj ,TCSL,hyd
Is This Answer Correct ? | 12 Yes | 0 No |
Answer / shiba_sap
Dear Hemanth,
I think you can do it in the following manner:
(1) Go to SE10.Find your request number ,then you will see
one development request number and one correction number.
(2) First click on correction number and the goto toolbar
and click on the transfer request button(lorry icon).
(3)The at the bottom bar you will find the change icon will
transfer in a RED-YELLOW-GREEN sequnce.once it became red
you will know that it has succesfully transferred.
(4)Now again go to find your request number and transfer it
in the same manner.
So in this way you can transfer the request from dev.
server to quality server.
Is This Answer Correct ? | 13 Yes | 2 No |
Firstly create a transport request with changes in a system.
Then you release it.(SE01).
Next, Basis will import the TR to the system you required where the changes should ultimately happen.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / reshmi
Via SCC1 you can transport customized request in target client whr u want to transfer from source client.like if u want to transfer from 200 server to 800 then u can transport it through SCC1 in target client.
Is This Answer Correct ? | 0 Yes | 3 No |
Answer / k. hemanth kumar
with ALE(APPLICATION LINKING AND ENABLING)
Is This Answer Correct ? | 3 Yes | 8 No |
How to merge two different outbound delivery nos. for same customer in VL02N?
After returning the materials In MMBE it shows the return material quantity is 0 Actually I have 3 storage location 1st one is son1 for finished materials,2nd one son2 for return materials and 3rd one son3 for scrap So 1st I made a sales order with quantity 20 with storage location son1 and made the delivery and invoiced. Now when i am checking the material through mmbe then i found 20 materials less. Now I am going to return material and made a sales order(va01-document type RE) and clicked with reference with sales order and next clicked on copy button Next I mentioned the order reason as poor quality and went to goto item level and specified another storage location as son2. Saved the sales order and next made the delivery-vl01n (with delivery type LR) and did PGR and saved the delivery. But when i am checking the material quantity in mmbe with storage location son2,at there I can’t find any return material.the return quantity is 0. So what is the problem in my configuration??
I Have 6 years experience in consumer durable sales. how is it helpful for me to get into sap-sd? As a fresher vl i get a package more than the current package? pls advise me in this regard. Thnaks, Jagan
What are the responsibilities of "core team" and "functional team" in an implementation?
During route determination the system also needs to know the departure zone of the goods to be shipped. How does this information come into the sales order?
What copy control is and when copy control transition can be done? In what manner copy control transition can be done?
What are the configurations to be made for PACKING?
what is functional specs in sap sd. I want it detail with examples. and also gap analysis.
Integration between mm,pp&sd
What is the difference between Configuration and Customization? I have been asked this question in an recent interview. How to answer this question along with examples? Plz provide answer to this question asap.... Waiting for your reply.... Thanks in advance.. Regards
What are Z errors?
What are inter-company customers?