Answer Posted / ven
As we assign particular material master to particular
plant it picks up from there.
| Is This Answer Correct ? | 2 Yes | 14 No |
Post New Answer View All Answers
In Order - what have you done exactly, did you do the entire setup in SAP, and if yes, can you walk me through it?
how to fill the GAPs in BBP?give me one example thanks in advance venkatesh
Which sub module of sap could make business areas obsolete and can one business area be assigned to several company codes? And what is z transaction?
What is the difference between pgi cancellation and returns order?
client wants to have sales of particular material area wise. How to write functional spec for this
what is difference between individual and collective requirement
There is an interface between sd and fi in invoicing. Can you think of another interface between sd and fi?
What is rush order?
Differentiate between shipping point and loading point.
Hai, Please post all SAP SD Q&A to my emailid: nagendra15061975@gmail.com
When we include a new customer, we have to maintain condition record every time or there is a process by which we can validate the condition record to that new customer belonging to the same sales area?
Where do we assign calender in the master records?
What is the difference between connected & unconnected lookup?
Do you have any link for customer master and credit management?
Gather Information For better understanding &analyze cases received through LNOB for pirs &ccrs