How we maintain one material at atime for two company codes?
Answers were Sorted based on User's Feedback
Answer / yogesh
we have to extend the material from one plant to another
plant
Is This Answer Correct ? | 13 Yes | 2 No |
Answer / jaswanth singh,hyderabad
i think we can move the goods from one company code to
another,with the help of cross company sales.
iam also not so correct about this,please correct this.
Is This Answer Correct ? | 8 Yes | 1 No |
Answer / debashis
It is not necessary to maintain a material fro 2 diff
company codes.
What we can do is maintain the material for 2 plants, in
the 2 company codes in which you wanted the material to be
maintained.
Just go to MM01, enter the material, then in the selection
fields select all, then enter the required plant, sales
area, SLOC, that will be it.
Just remember to fill the Accounting Views (both 1 and 2)
data in case they are not copied from the previous plant
(if they are different).
Enter a few of the mandatory fields that the system will
prompt, like Availability check and loading group etc.
And you will be through.
But, in this case if the materils is active for GTS (Global
Trade services), you may expect a GTS block while working
with the material in the new plant. Since if the material
is extended to a new plant then it needs a new license for
it.
Other than that I feel that this will work pretty well.
Is This Answer Correct ? | 6 Yes | 0 No |
Answer / siva
I agree with the above answer.. but for cross company sales
after making all the required customisation, you asign the
material to the sales organisation of a different co.code
other than that of the original plant's co.code. but u donot
maintain the material for two diferent co. codes as such..
pls correct me if im wrong..
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / sid
In addition to Yogesh's reply, Yes. You can extend the
material to the other plant.
In MM01, you have the option to copy the material info from
one plant to the other ,Provide the plant name of the other
company in the plant name field .thereby you maintain the
material info for 2 diff company(plant).
Please correct if this is wrong
Is This Answer Correct ? | 3 Yes | 1 No |
Answer / yogesh
.
there is no need to maintain one material for different co.
code just defined plant for cross system goods flow becouse
material is mainly related to plant and we create it at
plant and sales area level
Pls correct me if i m wrong
Is This Answer Correct ? | 1 Yes | 0 No |
Answer / naveen s
Yes, I agree with Sidh, You can extend material to the
other plant in mm01, you can copy the plant and and storage
location from where you want to copy apart from that you
have to assign plant to sales org, distribution channel in
enterprise structure. so that you will not face any problem
while creating customer master record (XD01). You need to
assign Plant to company code in enterprise structure.
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / arvind
We can have one material for 2 company codes.
To cement the fact we can have the stock trasfer scenario
where the Selling and purchaisng organisation have the same
material and their company codes are different.
Also in the case of intercompany billing we have material
present in two company codes for the intercompany billing
ot take place.
Is This Answer Correct ? | 0 Yes | 0 No |
Material is maintained always in client level, whatever if a material need to be maintained in two different plants belonging to different comp. codes we need to extend them in both the plants
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / siva
I suppose you cant maintain the same material master for
two different company codes. I beleive you should have two
different master records for the same material across two
different co. codes. Pls correct me if im wrong.
Is This Answer Correct ? | 1 Yes | 5 No |
Hi SD Gurus,What does a functional specification document contains? How do we work with Functional Specification Document? What is Business Knowledge/ Process review?Please give examples from your real time data from your project.Please answer this question asap.... Looking forward for your express reply...I have interview within 1-2 days. So, give reply to this query asap.. Thanks in advance. Regards
In sales order how system does picks up plant?
How system determines as special stock to normal stock in special business processes
Can you split deliveries into several invoices? When would you do that?
Hi All, I am taking the SAP SD course and need some live case studies for my practice, can any one help me in this regard. You can mail it on my mail id: simkim4u@gmail.com Thanks, Sameer
what is Business Process Reengineering ? that you have applied in your SAP implimentation project . plz reply .. **suchit**
hi gurus, i have used variant configuration(a customer ordering a computer diff combination of monitor,cpu,keyboard) this is my scenario. i have taken and assigned(ct04,cl02,mm02) dov(10x11,11x12,12x13),colour(red,brown,grey),price(sdco,vko nd).now those were again assigned in cu01. can u provide solution urgent.
What is the signifacance of condition type "PMIN" in SD pricing procedure?
A customer wants to ship goods to one party, bill to one party and collect payment from another party. How to configure it in sap?
I am into pharma sales for last 7 years . I have heard that there is a scope forpeople like us in SAP SD functional area.. can you help me how to go ahead for this and what type of preparation do i need to take ?
Company launches a new product and gives 5% discount for only 100 qty from Jan 1st to 10th. The customer can order 50 qty on 2nd Jan & another 50 qty on 5th Jan or the customer can order 100 qty on the same day itself. But the discount applies only for 100 qty. If the customer orders 120 qty then 100 qty will have discount and for the remaining 20 qty no dsicount. how will u configure in the system.
What is the client no of SAND BOX.GOLDEN CLIENT, UNIT TESTING,ENDUSER TRAINNING AND PRODUCTION SERVER?????