How we maintain one material at atime for two company codes?
Answer Posted / siva
I suppose you cant maintain the same material master for
two different company codes. I beleive you should have two
different master records for the same material across two
different co. codes. Pls correct me if im wrong.
Is This Answer Correct ? | 1 Yes | 5 No |
Post New Answer View All Answers
What is a field catalog?
Is anyone familiar with allocation run – Tcode is Arun_ITA?
Hi SD Gurus, Have you worked with an ABAPer for Smart Scripts / Smart Forms/ Form Lay outs used for Output Determination for your client’s requirement? Please provide detailed Explanation along with Configuration & Customization procedure, Steps, Analysis, path, t-codes and solution to the above questions as soon as possible? Also provide the logic for arriving at the resolution? If you can give simple example with simple coding written by ABAPer it would be great? Please include your real time data examples as many as possible with relation to your client/ Project? It’s Urgent!!!!!! I have interview within 1-2 days? So, I request you to provide solutions to above question as early as possible? Your timely help would be greatly appreciated? Thanks in advance Regards
Do you know what is made to order scenario or make-to-stock scenario? SO, in the make-to-order scenario, what’s the integration touchpoint that you figure MRP? My question is when you have a make-to-order scenario, how does MRP will be figured? How system know that when you create a sale order whether the sale order is calling for make to order or make to the stock type of order, which data determined this is made to order make to stock…. The system should understand when I create an order, whether it’s made to order or make to stock, so which parameter which value that system will be determined based on that system will say okay this make to order so I need to I mean the system has to go to the next level then it’s going to the MRP all the subsequent planning will be taken taking place, what’s the parameter that we have to check?
Hi, Can anyone proivde the soluiton for the below senirio, thanks in advance. We are providing test services to various sites of a corporate. Now, we want to bill as a single bill point i.e. Corporate office. Single bill for each site will be generated. E.g. Panac Labs, New Delhi Head Office Panac Labs, Mumbai Lab at Mumbai Panac Labs, Kolkata Lab at Kolkata Panac Labs, Indore Lab at Indore In above case, we are cattering services to all four locations. However, New Delhi is the Head office and Lab too. Hence we will issue four bills addressed to Panac Labs, New Delhi. Outstanding and debtors will be maintained on A/c of Panac Labs, Head office. We also want to maintain sub- ledger base on sites
what are the components of sd?
Can anyone tell me the link for interview question for SD module. . . As i m fresher so i really need to know what sort of question i will to have face during interviews . . . .
the condition type DIFF is not triggered in sales order.in the sales order if 2 line items are there from two different plants.for one material it is showing error but for the other it is working fine.what could be the reason?
Is it possible to automate output processing? The answer should be yes but how??
Mention what are the sales document types in sap? What is the configuration step to define sales document type in sap sd?
what are the two places where you need to configure cin (country version india)?
PRICING…… I have a requirement where I have a fright condition which is a header condition for the whole document, I will be maintaining the fright condition recorder (header level) because it’s header condition, now the requirement is if I want to have 5 conditions to be calculated for each item because let’s say I have 5 line items, I want to see how the side calculated first of each item so what’s the best way to take out that out of the system in standard configuration, how can we achieve this?..... REPEATING question (I have a fright condition, now fright condition is a header condition, now my requirement is I wanted to applied that fright condition each line item level so fright condition applies a header level but my requirement is I want to see each and every line item should also get this fright condition on the value of the item, let’s say my fright is $100 so I have 5 line item, each item has the 10 10 10… so build on that value I want to purpurnate the fright condition, how can we achieve this from the standard system configuration stand point?
In a material master what is the base unit?
Bom usage when we create a bom through cs01, what effect does bom usage field have on subsequent configuration? For example, if we take it as 1=production or 5=sales what effect will it have on subsequent processes?
What are the important organizational elements of sap sd?