Both labor and machine categories exist. How would you calculate the process time?
No Answer is Posted For this Question
Be the First to Post Answer
Explain Flexible Planning procedure or How many levels of Flexible planning.
How mrp (material requirement planning) types are classified?
How can we shut off the "automatic costing indicator" and the "automatic scheduling indicator" which go on when the production order is released?
Do you use group BOMs for engineering/design and copy or assign them to plants at implementation?
What are mandatory fields for PP configuration
Can't one material be assigned to more than one operation in a routing?
Tell some sop
Splitting of production order & product version
while extending the material master view after saving error is coming that the field material number is defined as a required field,it doesnt contain an entry. After selecting that it is showing the particular material may be locked. Pls do the needful.
what is the difference between backward scheduling and forward scheduling ?
We are trying to create purchase requisition from mrp run. We have material, info record, source list, demand in place. Mrp is always creating plan order. Why?
what is the meaning of explodinG a BOM