How to group employees for their allowances in payroll?
No Answer is Posted For this Question
Be the First to Post Answer
Tell me deferent MRP types
Explain how the pp module is organized in sap?
how costing is done in pp or how u will know the cost of a product which is manufactured in ur plant
One work center can assign 2 cost center and one cost can assign to different work center.
If there are some errors in goods movements, and less stock of material consumed, how can i solve that problem in SAP.
What is the opening period?
1. how Product Cost Collector Works? 2. What are the master data for MRP? 3. In a production order without making goods issue, i should not be able to do goods receipt. How do we do it? 4. i have one particular part 'A'. it is available in two storage location X & Y. when i run MRP, I don't want MRP to consider stock that are available in storage location Y. what should be done. 5. for in-house production, planned order are generated & for external procurement purchase requisition. i want, system will go in external procurement to a particular vendor. what is the setting? 6. what are the problems you faced in MRP?
Define lsmw.
Integration between PP and PM module.
How many levels of Flexible Planning are there?
What is Auto GR?
What is alternative bom