Explain why there is need of production version?
No Answer is Posted For this Question
Be the First to Post Answer
What is 'capacity planning'?
Suppose the client wants me the vacancy to be displayed on a website as well as ess. How should I do it?
Tell me important of the Production scheduling profile what are the things have to maintain in this profile
If MRP type PD/ND in material master how will work flow.?
What is the difference between stock transport order and stock transfer order?
If there are some errors in goods movements, and less stock of material consumed, how can we solve that problem in sap ?
Explain how ‘pp’ is ‘integrated’ with other modules?
IM GOING TO GO FOR AN INTERVEIW SOON AND I WANT TO KNOW WHAT SAP PP INTERVEIW QUESTIONS ARE LIKE. I DONT HAVE A REALTIME EXPERIENCE THOUGH. ITS MY FIRST TIME
Overlapping and splitting, where do you assign?
I want to make a career in SAP-PP/QM from the existing manufacturing experence.
Define mrp group
What are some important tables used in pp (production planning)?