Difference between NETCH, NETPL and NEUPL.
Answer / ahilan
NETCH(Net Change Planning): Material that undergone any changes, inbetween the last MRP and current MRP are taken into the account.
NETPL(Net Chane for Planning Horizon): Material that undergone any changes, since the last MRP within planning horizon.
NEUPL(Regenerative Planning): It checks the entire change inside the plant.
Is This Answer Correct ? | 0 Yes | 0 No |
what are the basics of PP ?
In sap-pp what are the costing parameters?
You want to insert an inspection check point at the end of an operation. How would you do that?
Explain what is sap pp?
Explain 'mrp' (material requirements planning)?
How do you do capacity planning ?
Mention what is the purpose of using capacity planning?
If MRP type PD/ND in material master how will work flow.?
What is mean by Standard Value, Scheduling Margin Key, Production Version, Product Cost Collector, Control Key,Demand Management.
How to create plant?
2 Answers GPIL, Yash Technologies,
In implementation stage tell some standard scenario before AS-Is & TO-BE
What is golive actually? What is the role of a functional consultant in golive actually?