i have one particular part 'A'. it is available in two storage location X & Y. when i run MRP, I don't want MRP to consider stock that are available in storage location Y. what should be done
Answer Posted / tim_coorgi
We have to define MRP storage location indicator as 1 for that storage location.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Explain the uses of the simple maintenance interface?
What are the keyfields found in mrp view 1?
Explain what is the use of sap material view and list out other parameters where sap material view is applicable?
Explain the planning steps for 100 products?
how many times pcc can run for one material?
what is alternative item group
Why work scheduling view is required for semi-finished and finished products?
How can I use variable size items?
We have a lot of size procedure here which is creating more order proposals. How do you set the limit value for the maximum number of mrp order proposals per date in img?
What is the difference between indian and us payroll?
Can we create production order without bom and routing ?
Explain the lsmw and the steps involved in them.
What is pi sheet
What is Material status and which view of the material master it is available?
Can any body explain me why work scheduling view is required for semi finished and finished products?