i have one particular part 'A'. it is available in two storage location X & Y. when i run MRP, I don't want MRP to consider stock that are available in storage location Y. what should be done
Answer Posted / tim_coorgi
We have to define MRP storage location indicator as 1 for that storage location.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
Difference between byproduct and co-product.
How many levels of Flexible Planning are there?
Explain the mrp group and their uses.
How to attach a drawing for a material to bom ? Is it possible ?
Why work scheduling view is required for semi-finished and finished products?
Define 'sop' (sales & operations planning)?
What is plm (product lifecycle management) in sap pp?
How to group employees for their allowances in payroll?
Integration between PP and PM module.
Explain what is the need of mrp list if the stock requirement list is already given?
What does a PP Consultant do in his/her real time?
What is the purpose of using capacity planning?
Different types of consumption based planning.
Can we use the same routine for materials undergoing the same process/operations? Can we avoid separate routing for each and every material produced?
Where we have to specify the teardown time in one operation?