i have one particular part 'A'. it is available in two storage location X & Y. when i run MRP, I don't want MRP to consider stock that are available in storage location Y. what should be done
Answer Posted / arun k
in mrp4 view we need define the mrp storage locattion indicator as 1
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
what are the problems you faced in MRP?
We have two storage locations are ‘0001’ and ‘0600’. Default storage location in process order is always ‘0001’ what determines this default location?
What is the recruitment cycle?
Difference between plan cost, Actual cost and target cost.
Explain what is prt (production resource tools) in sap pp?
What is qualification deficiency?
Overlapping and splitting, where do you assign?
list the important tables used in pp.
What is the use of t-code cs20 in bom?
What is phantom item & sub contracting
Explain Flexible Planning procedure or How many levels of Flexible planning.
Explain what is plm (product lifecycle management) in sap pp and what is the use?
What are basic dates?
Explain the Difference between the Discreet and REM.
Explain how to create prt master records?