Calculate the quantity of concrete for the following.
2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m
length.
Answers were Sorted based on User's Feedback
Answer / pravat
Volume=π/4 {Ld^2+0.4N(D^2-d^2)(D-d)}
Where d=dia of pile
D=dia of under ream
L=length of pile
N= no of under ream.
This the formula for pile with any no of under reams.
| Is This Answer Correct ? | 58 Yes | 16 No |
Answer / amit kumar sachin
Rcc Volume of 2no. Bulb (without pile rcc)
Formula = π/4 {0.4N(D^2-d^2)(D-d)}
Where d=dia of pile
D=dia of under ream(bulb)
N= no of under ream.
Calculation-
Dia of bulb(D)= 2.5 times of dia of pile
D=2.5×0.30 =0.75m
Rcc volume= π/4 {0.4×2×{(.75)^2-(.30)^2}(.75-.30)
= 0.133 m^3
| Is This Answer Correct ? | 12 Yes | 2 No |
Answer / h kumat
Volume of pile = A
= 3.14×(0.30/2)²×10=0.707m³
Volume of two undeream = B
=2× 2.44(0.30)³=0.13 m³
Totol volume of pile & underream=A+B
=0.707+0.13= 0.837m³
Be sure about shape of underream before use this formula.
| Is This Answer Correct ? | 23 Yes | 16 No |
Answer / dr. maninder singh khalistani
Volume of underream=2*3.14*.3*.3*.3/6=. 028m3
| Is This Answer Correct ? | 2 Yes | 3 No |
Answer / saideepak nagajjanavar
Pile length- 10 m
Pile dia- .15m
10X.15X.15=0.225
0.225X3.142=0.7069
Ans:07069
| Is This Answer Correct ? | 5 Yes | 7 No |
Answer / aman kumar
Length of bulb=0.55 m
Dia. of bulb=2.5*0.3=0.75 m
Extra for bulb=0.75-0.3=0.45 m
Bulb volume= Area*Perimeter=1/2*0.55*0.225*3.14*0.3=0.058 cum for 1 bulb.
Pile volume=3.14/4*0.3*0.3*10=0.707 cum
So, For 1 bulb,Total quantity=0.707+0.058=0.765 cum
And For 2 bulb,Total quantity=0.707+2*0.058=0.823 cum
| Is This Answer Correct ? | 4 Yes | 8 No |
Answer / lisy rajan
Quantity of concrete= 2* 3.14*.15*.15*10=1.413m3
(with out deducting steel)
| Is This Answer Correct ? | 4 Yes | 12 No |
Answer / bharath m,+91 8438238335/99806
2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m
length.
Solution :
(Pls. refer construction practice book & IS 2911 Part-III.)
2 under reamed pile means there are 2 Nos. of bulbs at particular spacing based on friction of soil.
Dia. of pile : 0.30 m. ie.,bulb dia. = 2.5 times dia. of pile
So it is 2.5*.3 = .75 m.
Length of Pile = 10.00 m.
Bulb thickness at pile intersection end (30-45degree inclination)= 1.75 times pile dia.
=1.75*.3
=0.525 m. &
free end = dia. of pile/4
=.3/4
=0.075 m.
Now follow the calculation:
Step 1:
Pile volume = Area x length
3.14/4*dxd x length
=3.14/4*.3*.3*10 = 0.707 Cubic Metre. ------1
Extra for Bulb Volume = Perimeter x Depth of bulb
=2*3.14*r x db
r at centre line of bulb = ((.75-.3)/2)+.3 = 0.525 m.
V=2*3.14x .525x(.525+.075)/2
=0.989 Cum. for 1 Bulb
V for 2 Bulb = .989*2
=1.978 Cubic metre -----2
Now combined Total Volume of Concrete 1+2 = .707+1.978 = 2.685 Cubic Metre.
| Is This Answer Correct ? | 44 Yes | 53 No |
Answer / sai
steel should be subtracted from 7065 let it be 1 percent 7065-70.65=6994.35
| Is This Answer Correct ? | 2 Yes | 12 No |
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
Hi, Please tell me the ISI specification for the duration of concrete to achieve full strength of concrete. Is it 28days?
what"s the formula to calculate the water for M15 grade concrete?
Describe the advantages and disadvantages of using plastic and timber fenders?
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
how much water you will add to the mix, for making 1 m3 of concrete to achieve strength of mix 20N/mm2 at 28 days.
400 ku d/c clearess ketan hota hai?
what is the difference between built-up area & carpet area? how to calculate this areas?as there are any formula to calculate these areas?
how can we design dia of rainwater pipes ? plez explain by using formula ?
What is is code for use TOR
why building got air crack? if it get in one particular are what is means?
WHAT IS DIFFERANCE BETWEN TOR STEEL AND TMT STEEL
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)