Calculate the quantity of concrete for the following.
2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m
length.
Answer Posted / saideepak nagajjanavar
Pile length- 10 m
Pile dia- .15m
10X.15X.15=0.225
0.225X3.142=0.7069
Ans:07069
Is This Answer Correct ? | 5 Yes | 7 No |
Post New Answer View All Answers
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
Suggest how many column, beem, etc required for 30 mtrs x 21 mtrs width x 8mtrs height for industrial shed of ground floor. I want to know the quantity of tmt steel consumption and Concrete consumption for budgeting
Define What is a kip?
What materials were used to build the golden gate bridge?
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
how much of the strength comes from post-production curing
How do we calculate absolute pressure?
What is structural frames or systems?
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
3. What are the disadvantages of your present job, things you do not like about it?
What are the composition of a landfill?
HOW TO CLACULATE CEMENT AND SAND CONSUMPTION FOR THE STAIRCASE KOTA FLOORING IN THE RATIO OF 1:4 50 MM THICKNESS
I have an span length 16 ft c/c
Soil bearing capacity formula
std penetration resistance in very stiff clays lies bet 2 & 4 4 & 8 8 & 15 15 & 30