Calculate the quantity of concrete for the following.
2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m
length.
Answer Posted / dr. maninder singh khalistani
Volume of underream=2*3.14*.3*.3*.3/6=. 028m3
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
How to calculate steel for beam slab and column
What do you mean by the word 'shear'?
What is the value of live load that should be incorporated in design of locker room and cash vault room while designing a building for commercial bank?
How to check slab shuttering level.? Or check list for slab ?
Define What is rigging?
what is concrete canvas?
How many cement sand ballast in cc 1:4:8 40mm
In jack arch floor, the rise is kept?
what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter
Which IS Code/American Code applied for coupler test of steel
why the openings of sieves are square io size?
What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?
Minimum and maximum size of the building components