Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Calculate the quantity of concrete for the following.
2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m
length.

Answer Posted / bharath m,+91 8438238335/99806

2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m
length.
Solution :
(Pls. refer construction practice book & IS 2911 Part-III.)
2 under reamed pile means there are 2 Nos. of bulbs at particular spacing based on friction of soil.

Dia. of pile : 0.30 m. ie.,bulb dia. = 2.5 times dia. of pile
So it is 2.5*.3 = .75 m.
Length of Pile = 10.00 m.
Bulb thickness at pile intersection end (30-45degree inclination)= 1.75 times pile dia.
=1.75*.3
=0.525 m. &
free end = dia. of pile/4
=.3/4
=0.075 m.
Now follow the calculation:
Step 1:
Pile volume = Area x length
3.14/4*dxd x length
=3.14/4*.3*.3*10 = 0.707 Cubic Metre. ------1

Extra for Bulb Volume = Perimeter x Depth of bulb
=2*3.14*r x db
r at centre line of bulb = ((.75-.3)/2)+.3 = 0.525 m.
V=2*3.14x .525x(.525+.075)/2
=0.989 Cum. for 1 Bulb
V for 2 Bulb = .989*2
=1.978 Cubic metre -----2

Now combined Total Volume of Concrete 1+2 = .707+1.978 = 2.685 Cubic Metre.

Is This Answer Correct ?    44 Yes 53 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to check slab shuttering level.? Or check list for slab ?

4606


how to workable concrete cube test M-25 design mix

3478


WHAT IS YOUR EXPECTED SALARY?

2103


what is flashing?

1178


How much Tolerance factors like 1. brick work 2.plaster 3.painting 4.floor tiling 5.wall tiling 6.shuttering 7.concreting 8.steel

1858


beam length 73 feet 4 inch,width 01 feet,height 50 inch so every beam load how much? and what quantity of M.S ROD? both side ony two column in middle no column.pls inform me that this is stable or not ? and how much risk of this beam?

2090


How to improve the strength of fly ash bricks to avoid corner damge? How to get the color lighter similar to normal concrete blocks/

1874


I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2100


How do we calculate absolute pressure?

1373


List out the potential risk factors for workers on the construction site?

1094


HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?

2199


Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?

1144


To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?

1969


what is the meaning of degreasing of the euipment or line.

4077


how many BSCs can i connect to the HUAWEI MSC

2321