explain water proofing in toilets and terrace
Answers were Sorted based on User's Feedback
Answer / ram mahidhar reddy
It can be done by applying water proofing material as a membrane ,
Or
It can be prevented by filling a water proofing slurry
Or
It can also be prevented by placing a layer of tiles (materials that are not allowing water to pass through it )
Is This Answer Correct ? | 0 Yes | 0 No |
WHAT IS THE DIFFERENCE BETWEEN FACTOR OF SAFETY AND PARTIAL SAFETY FACTOR?
1sqm tile laying how much cement required?
what is the soil bearing capacity for a 5 floor multistorey residential building and which type of soil ? what is plinth beam? in wall load calculation center to center column distance is considered or not/
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.
how much cement and sand 1:6 plastering
what is the definition of stress& strain.
what is derating factor in cable? what does it mean if derating factor is high/low in terms of thermal resistivity of soil?
How do you prepare Material Recovery Statement for deduction from contractors bills?
How to distinguish that the soil is clay, silt, sand & murrum at site. (just by looking at it with out doing the sieve analysis test??
Kindly tell me a book name to study for BIS exam
IN CIVIL ENGINEERING DESIGN WHY WE ARE USING LIMIT STATE METHOD IS BEST? I THINK WORKING STRESS METHOD IS BEST? EX; FOR COLOUMN DESIGN IN LIMIT STATE METHOD AST IS;1913SQ.MM SAME TIME WORKING STRESS METHOD IS ;2213. SO I THINK WORKING STRESS METHOD IS VERY STRONG COMPARE THEN LIMIT STATE METHOD? MY OPENING IS CORRECT OR NOT? PLS TO EXPLAIN SIRS
Explain what are the phases inspections are done by local authority while construction?