Calculate the quantity of concrete for the following.
2 Under-reamed cast in situ pile of 300 mm dia. of 10.00 m
length.
Answer Posted / amit kumar sachin
Rcc Volume of 2no. Bulb (without pile rcc)
Formula = π/4 {0.4N(D^2-d^2)(D-d)}
Where d=dia of pile
D=dia of under ream(bulb)
N= no of under ream.
Calculation-
Dia of bulb(D)= 2.5 times of dia of pile
D=2.5×0.30 =0.75m
Rcc volume= π/4 {0.4×2×{(.75)^2-(.30)^2}(.75-.30)
= 0.133 m^3
| Is This Answer Correct ? | 13 Yes | 2 No |
Post New Answer View All Answers
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
How we can calculate the cement, sand,bricks , water , quintity in 1:6 Ratio 1 cubic metre b/w and 1:4 Ratio in 1 Squre metre b/w????
What in bending moment, if a moment is free end of cantilever beam?
Dear Engineers, Can you please advise me the material requirement to construct a room 4 M x 4 M 1. No. of Standard Brick 2. Requirement of Cement Bags 3. And Concrete for Steel, Cement, sand, etc Thanks
What is meant by dimensioning?
what does the grad of cement shows (denotes)?
Define What is the best type of wood glue?
Q 1) 1 Mason and 2 LABOUR / _________CUM brick work Q 2) 1 Mason and 1 LABOUR / _________SQ FT Plaster work Q 3) 1 Carpenter & 2 Labour/_________SQ FT shuttering work Q 4) 100 SQ FT roof slab concreting ____________mason and labour required
How is calculate the cube molt
detailed calculation of the amount of cement used?
TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING
What is braced excavation all about?
how to identify np3 pipe and np4 pipe
when it is noted "JAMB SIM" what is the term "SIM" and what does it mean?
IS THERE ANY JOBS FOR THOSE WHO ARE IN FINAL YAER OF ENGINEERING(CIVIL) IN MUMBAI