brick work 1cum kitne cft hote hai
Answers were Sorted based on User's Feedback
sir how can we find the cement and sand required for making 4" drop
Some one plz help me sir ..m gonna start my g 2 rcc building i have a simple design and i want material estimate plz sir help me.someone plz mail to blue print .thnq
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?
what is the cost differene of a same structure when it is constructed with brick masonary, and when it is constructed with concrete as a frame structure.????????
What is code for designing a sheet pile?
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
why will provide chair in slab
What will be the exam pattern and syllabus for j.e post of haryana staff selection commision? Advt no. (02/2015) Some people says it would only be objective type question papers while others say it would be same as ssc (1 objective,1 conventional) ?? Please answer this question it is needfull to all.
for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help
Coverage of 25mm.thick ratio of 1:4 cement mortar?
what is pH value of sewage&water.if pH value is given then how to calculate H+.
How to preparation billing for high rise building? anyhow can give the tips