Thumb rules for
1.brickwork & Blockwork
2.Plastering
3.FLooring and tiles
4.Shuttering
5.Steel
Answer / nitin sharma
brickwork & Blockwork:- flooer area 1time
2.Plastering:- internal floor area time and outer floor area 1time
3.FLooring and tiles:- floor area 1 time,not including toilet
4.Shuttering:- with beam floor area 1.5 time and including column 2time
5.Steel:-3.5 kg to 4.5 kg per sqf
| Is This Answer Correct ? | 2 Yes | 0 No |
what is the basic difference between a singly reinforce section & a doubly reinforce section?
how new RCC roof joined with existing RCc roof
how 1.52 factor comes while calculating no of bags of cement...from 1:2:4 design mix?
4 Answers CCCL, L&T, Vishwa Infrastructures,
how must steel will use for 1 cubic meter.formula of steel for beam,column,lantern.
17 Answers CCCL, Gulf Construction, KITECH, L&T, Mars Planning Engineering Services, NHAI, Simplex, Supertech, Yamaha,
factor which affects design of concrete mix
How much is anchor length ?
what is the coefficient for running feet to cft coversion both area and price
How to check the quality of fine aggregate on site?
How much used for sand per square meter in 12mm Thickness
i need a labour rates of all civil works ? eg) brick,pcc, smm, inner plaster,outer plaster,centering, bar-bending. and also need all material rates latest?
How to calculate carrying capacity of the existing water supply trunkmain
In which direction is bottom bar of rectangular footing is placed in short or long.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)