Thumb rules for
1.brickwork & Blockwork
2.Plastering
3.FLooring and tiles
4.Shuttering
5.Steel
Answer / nitin sharma
brickwork & Blockwork:- flooer area 1time
2.Plastering:- internal floor area time and outer floor area 1time
3.FLooring and tiles:- floor area 1 time,not including toilet
4.Shuttering:- with beam floor area 1.5 time and including column 2time
5.Steel:-3.5 kg to 4.5 kg per sqf
| Is This Answer Correct ? | 2 Yes | 0 No |
what in total station list counting
1:6 mortar, how many self life hours ?
CALCULATE QUANTITY OF RCC COLUMN
how much area can be platered by a mason for exterior
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
While painting,if the gypsum is the first coat to seal holes on wall,It said to have tendency get away with all other coat. What is the solution on that?
How do you calculate load bearing capacity of a waffle slab?
how to convert ft3 to m3?
pile load testing procedure
how to the steel dia without using d2/162
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
How much percentage of silt contain maximum allowed?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)