brick work with 1:6 cement mortar how many bricks and
cement and sand require for 1cum

Answers were Sorted based on User's Feedback



brick work with 1:6 cement mortar how many bricks and cement and sand require for 1cum..

Answer / vijendrasinh

1 cum ratio 1:6

brick - 445 nos + 5 percent add.=500 nos App.

mortar 1 cum .30

cement= (1/7)*0.3=0.0428/.035=1.224 bags

sand= (6/7)*.30=0.26 cum.

Is This Answer Correct ?    15 Yes 2 No

brick work with 1:6 cement mortar how many bricks and cement and sand require for 1cum..

Answer / feedly244

if brick size 240mm*115mm*71mm
so =0.00195cum
for full wall 25%(0.25)of mortar required
for half wall 30%(0.3)
if full wall means
req bricks=1-(1*0.25)=0.75cum
so=0.75/0.00195=384.6 no of bricks

req cement=0.25/(1+6)=0.0357cum
so=0.0357*1440=51kg

req sand=0.0357*6=0.214cum
note:prepare 15% extra mortar bcoz of voids presented in sand

Is This Answer Correct ?    2 Yes 0 No

brick work with 1:6 cement mortar how many bricks and cement and sand require for 1cum..

Answer / neel

for one cum 1: 6 cement mortar brickwork

Bricks:- 500 no
Cement:- 15 bags
Sand :- 2.5 cum ( .9 brass)

Is This Answer Correct ?    3 Yes 11 No

Post New Answer

More Civil Engineering Interview Questions

how to calculate estimation for puttey... give me an example

1 Answers  


what is the different between np2& np3 rcc hume pipe

1 Answers  


how many weight of 1Cum Sand ???

4 Answers   CCC,


how many kg sand is requried for plastring in 100 sqft?

5 Answers   L&T,


Plz tell how to find out stell bend correction for all angle of bend and in where it is? Plz answer

1 Answers  


WHAT YOU MEAN BY PROOF STRESS?

3 Answers  


If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)

1 Answers   GeoTechnology,


WHAT IS DIFFERANCE BEWTWEEN NP2 AND NP3 OF RCC HUME PIPE?

2 Answers  


It needs contour survey before plastering a wall / column & floor tiles setting to get––

1 Answers  


How do you compute the volume of airflow?

1 Answers  


if i have to draw bending moment diagram of 4 way continous span then how to create it and how to find reaction?

1 Answers  


what is meant by camber

1 Answers   NCC,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)