Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

1 Cum Brick Work CM 1: 6 - How Many Bricks ,sand,Cement
Required? Brick Size 9" 4.5" 3"

Answer Posted / ashish jain

Bricks- 460Nos
Sand- .29 cum
Cement- 1.7 begs

Is This Answer Correct ?    6 Yes 20 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What do you meant by gui?

1291


how to caliculate required amount of cement and sand required for 1cu.m.

2271


silt%= silt volume/ silt+sand volume is this right?

2076


what is difference between fluidity and workability also how palsticizer works

7534


significance of specific surface area of particles?

2183


What is the density of Fiber reinforced concrete and give me the which fibers we can use in Concrete?

2076


What are new methods /technologies of pothole patching?

2462


What is the difference between linear dimension and aligned dimension?

1086


which has high compressive strength between hollow block and brick masonry?

2427


what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.

2491


how much repeitation for conventional and maivan formwork?

2054


will fix foundation bolts at site with out template is there any procedure?

2689


Which is the direction for positive angle?

1399


Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.

2918


how to take concrete quantity for precast segment for viaduct project?

3137